Dealing with construction permits: Quality control after construction in Maldives
Maldives: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Maldives, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control after construction in Maldives is 0 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
Maldives ranks 176th of 183 countries on this measure, in the bottom quarter.
Countries ranked near Maldives
- 176 Afghanistan 0 DB16-20 methodology compare
- 176 Equatorial Guinea 0 DB16-20 methodology compare
- 176 Liberia 0 DB16-20 methodology compare
- 176 Marshall Islands 0 DB16-20 methodology compare
- 176 Micronesia (country) 0 DB16-20 methodology compare
- 176 Nicaragua 0 DB16-20 methodology compare
- 176 Samoa 0 DB16-20 methodology compare
More private sector data for Maldives
- Merchandise trade 52.5% (2025)
- Food imports 21.2% (2024)
- Manufactures imports 53.7% (2024)
- Merchandise imports 3.62 billion current US$ (2025)
- Food exports 94.4% (2024)
- Manufactures exports 1.2% (2024)
- Merchandise exports 444.00 million current US$ (2025)
- Commercial service exports 5.02 billion current US$ (2024)
- Transport services 26.5% (2024)
- Computer, communications and other services 40.0% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Maldives?
- Dealing with construction permits: quality control after construction in Maldives was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Maldives?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Maldives?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Maldives rank for dealing with construction permits: quality control after construction?
- Maldives ranks 176th out of 183 countries with data for 2019.
- Where does this Maldives data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.