Antigua and Barbuda vs Burundi: Dealing with construction permits: Quality control during

Antigua and Barbuda
1 DB16-20 methodology
in 2019
Burundi
1 DB16-20 methodology
in 2019
Antigua and Barbuda rank
139th
Burundi rank
139th

Dealing with construction permits: Quality control during over time

  • Antigua and Barbuda
  • Burundi
00.20.40.60.81201420162019

How they compare

Antigua and Barbuda currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Burundi, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Antigua and Barbuda ahead.

Antigua and Barbuda ranks 139th and Burundi ranks 139th of 186 countries.

Antigua and Barbuda has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Antigua and Barbuda or Burundi?
Antigua and Barbuda, at 1 DB16-20 methodology against 1 DB16-20 methodology in Burundi as of 2019.
What is the difference in dealing with construction permits: quality control during between Antigua and Barbuda and Burundi?
0 DB16-20 methodology, with Antigua and Barbuda ahead.
How many years of comparable data are there for Antigua and Barbuda and Burundi?
6 years are reported by both, from 2014 to 2019.
How do Antigua and Barbuda and Burundi rank globally for dealing with construction permits: quality control during?
Antigua and Barbuda ranks 139th and Burundi ranks 139th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Antigua and Barbuda vs Burundi: Dealing with construction permits: Quality control during. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/antigua-and-barbuda/burundi/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/antigua-and-barbuda/burundi/">Antigua and Barbuda vs Burundi: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.