Dealing with construction: Quality control during in Antigua and Barbuda

Antigua and Barbuda: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
139th
of 186 countries
All-time high
1 DB16-20 methodology
in 2014
All-time low
1 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in Antigua and Barbuda, 2014–2019

00.20.40.60.812014201620192014: 1 DB16-20 methodology2015: 1 DB16-20 methodology2016: 1 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Antigua and Barbuda recorded 1 DB16-20 methodology for dealing with construction permits: quality control during in 2019. That is the highest value across all 6 years on record.

That represents a change of unchanged over ten years.

That places Antigua and Barbuda 139th out of 186 countries with data for 2019, putting it in the middle of the range.

Dealing with construction: Quality control during in Antigua and Barbuda, year by year

Annual values for Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology) in Antigua and Barbuda, 2014 to 2019.
Year DB16-20 methodology Change
2014 1 DB16-20 methodology —
2015 1 DB16-20 methodology +0.0%
2016 1 DB16-20 methodology +0.0%
2017 1 DB16-20 methodology +0.0%
2018 1 DB16-20 methodology +0.0%
2019 1 DB16-20 methodology +0.0%

Antigua and Barbuda compared with similar countries

  • Antigua and Barbuda's 1 DB16-20 methodology is below the median for high income countries, which is 2 DB16-20 methodology, 50% of the median. (62 countries reporting)
  • Antigua and Barbuda's 1 DB16-20 methodology is above the median for Latin America & Caribbean, which is 1 DB16-20 methodology, 1.0× the median. (33 countries reporting)

Countries ranked near Antigua and Barbuda

  1. 139 Burundi 1 DB16-20 methodology compare
  2. 139 Central African Republic 1 DB16-20 methodology compare
  3. 139 Dominica 1 DB16-20 methodology compare
  4. 139 El Salvador 1 DB16-20 methodology compare
  5. 139 Grenada 1 DB16-20 methodology compare
  6. 139 Guyana 1 DB16-20 methodology compare
  7. 139 Haiti 1 DB16-20 methodology compare
  8. 139 Honduras 1 DB16-20 methodology compare
  9. 139 Kenya 1 DB16-20 methodology compare
  10. 139 Kiribati 1 DB16-20 methodology compare
  11. 139 Malawi 1 DB16-20 methodology compare
  12. 139 Seychelles 1 DB16-20 methodology compare
  13. 139 Solomon Islands 1 DB16-20 methodology compare
  14. 139 South Sudan 1 DB16-20 methodology compare
  15. 139 Sri Lanka 1 DB16-20 methodology compare
  16. 139 East Timor 1 DB16-20 methodology compare
  17. 139 Togo 1 DB16-20 methodology compare
  18. 139 Trinidad and Tobago 1 DB16-20 methodology compare
  19. 139 Vanuatu 1 DB16-20 methodology compare
  20. 139 Zambia 1 DB16-20 methodology compare

See the full ranking of 186 places →

More private sector data for Antigua and Barbuda

All data for Antigua and Barbuda →

Frequently asked questions

What is dealing with construction permits: quality control during in Antigua and Barbuda?
Dealing with construction permits: quality control during in Antigua and Barbuda was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in Antigua and Barbuda?
The highest recorded value was 1 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control during recorded in Antigua and Barbuda?
The lowest recorded value was 1 DB16-20 methodology in 2014.
How does Antigua and Barbuda rank for dealing with construction permits: quality control during?
Antigua and Barbuda ranks 139th out of 186 countries with data for 2019.
Is dealing with construction permits: quality control during rising or falling in Antigua and Barbuda?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Antigua and Barbuda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in Antigua and Barbuda. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/antigua-and-barbuda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/antigua-and-barbuda/">Dealing with construction permits: Quality control during in Antigua and Barbuda</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.