Dealing with construction: Quality control during in Burundi
Burundi: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ◆ Volatile
Dealing with construction permits: Quality control during in Burundi, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during in Burundi stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.
That places Burundi 139th out of 186 countries with data for 2019, putting it in the middle of the range.
Dealing with construction: Quality control during in Burundi, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 0 DB16-20 methodology | — |
| 2015 | 0 DB16-20 methodology | — |
| 2016 | 0 DB16-20 methodology | — |
| 2017 | 1 DB16-20 methodology | — |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Burundi compared with similar countries
- Burundi's 1 DB16-20 methodology is above the median for low income countries, which is 1 DB16-20 methodology, 1.0× the median. (20 countries reporting)
- Burundi's 1 DB16-20 methodology is below the median for Sub-Saharan Africa, which is 2 DB16-20 methodology, 50% of the median. (46 countries reporting)
Countries ranked near Burundi
- 139 Antigua and Barbuda 1 DB16-20 methodology compare
- 139 Central African Republic 1 DB16-20 methodology compare
- 139 Dominica 1 DB16-20 methodology compare
- 139 El Salvador 1 DB16-20 methodology compare
- 139 Grenada 1 DB16-20 methodology compare
- 139 Guyana 1 DB16-20 methodology compare
- 139 Haiti 1 DB16-20 methodology compare
- 139 Honduras 1 DB16-20 methodology compare
- 139 Kenya 1 DB16-20 methodology compare
- 139 Kiribati 1 DB16-20 methodology compare
- 139 Malawi 1 DB16-20 methodology compare
- 139 Seychelles 1 DB16-20 methodology compare
- 139 Solomon Islands 1 DB16-20 methodology compare
- 139 South Sudan 1 DB16-20 methodology compare
- 139 Sri Lanka 1 DB16-20 methodology compare
- 139 East Timor 1 DB16-20 methodology compare
- 139 Togo 1 DB16-20 methodology compare
- 139 Trinidad and Tobago 1 DB16-20 methodology compare
- 139 Vanuatu 1 DB16-20 methodology compare
- 139 Zambia 1 DB16-20 methodology compare
More private sector data for Burundi
- Merchandise trade 45.2% (2025)
- Food imports 13.7% (2023)
- Manufactures imports 61.1% (2023)
- Merchandise imports 1.19 billion current US$ (2025)
- Commercial service imports 389.34 million current US$ (2025)
- Food exports 46.0% (2023)
- Manufactures exports 15.2% (2023)
- Merchandise exports 332.00 million current US$ (2025)
- Commercial service exports 77.22 million current US$ (2025)
- Merchandise exports (current US$), per capita 23.07 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Burundi?
- Dealing with construction permits: quality control during in Burundi was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Burundi?
- The highest recorded value was 1 DB16-20 methodology in 2017.
- What is the lowest dealing with construction permits: quality control during recorded in Burundi?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Burundi rank for dealing with construction permits: quality control during?
- Burundi ranks 139th out of 186 countries with data for 2019.
- Where does this Burundi data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.