China vs Rwanda: Dealing with construction permits: Quality control during construction
China
3 DB16-20 methodology
in 2019
Rwanda
3 DB16-20 methodology
in 2019
China rank
1st
Rwanda rank
1st
Dealing with construction permits: Quality control during construction over time
- China
- Rwanda
How they compare
China currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Rwanda has been ahead every year.
China ranks 1st and Rwanda ranks 1st of 183 countries.
Rwanda has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, China or Rwanda?
- China, at 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between China and Rwanda?
- 0 DB16-20 methodology, with China ahead.
- How many years of comparable data are there for China and Rwanda?
- 6 years are reported by both, from 2014 to 2019.
- How do China and Rwanda rank globally for dealing with construction permits: quality control during construction?
- China ranks 1st and Rwanda ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.