Dealing with construction permits: Quality control during construction in China

China: Dealing with construction permits: Quality control during construction was 3 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
3 DB16-20 methodology
Change on year
up 50.0%
World rank
1st
of 183 countries
All-time high
3 DB16-20 methodology
in 2019
All-time low
2 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during construction in China, 2014–2019

01232014201620192014: 2 DB16-20 methodology2015: 2 DB16-20 methodology2016: 2 DB16-20 methodology2017: 2 DB16-20 methodology2018: 2 DB16-20 methodology2019: 3 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control during construction in China is 3 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 50.0% on the previous year and up 50.0% over ten years.

China ranks 1st of 183 countries on this measure, in the top 10%.

Countries ranked near China

  1. 1 Russia 3 DB16-20 methodology compare
  2. 1 Australia 3 DB16-20 methodology compare
  3. 1 Denmark 3 DB16-20 methodology compare
  4. 1 Djibouti 3 DB16-20 methodology compare
  5. 1 Estonia 3 DB16-20 methodology compare
  6. 1 France 3 DB16-20 methodology compare
  7. 1 Hong Kong 3 DB16-20 methodology compare
  8. 1 Ireland 3 DB16-20 methodology compare
  9. 1 Luxembourg 3 DB16-20 methodology compare
  10. 1 Netherlands 3 DB16-20 methodology compare
  11. 1 New Zealand 3 DB16-20 methodology compare
  12. 1 Peru 3 DB16-20 methodology compare
  13. 1 Rwanda 3 DB16-20 methodology compare
  14. 1 Singapore 3 DB16-20 methodology compare
  15. 1 Sweden 3 DB16-20 methodology compare
  16. 1 United Arab Emirates 3 DB16-20 methodology compare
  17. 1 United Kingdom 3 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for China

All data for China →

Frequently asked questions

What is dealing with construction permits: quality control during construction in China?
Dealing with construction permits: quality control during construction in China was 3 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during construction recorded in China?
The highest recorded value was 3 DB16-20 methodology in 2019.
What is the lowest dealing with construction permits: quality control during construction recorded in China?
The lowest recorded value was 2 DB16-20 methodology in 2014.
How does China rank for dealing with construction permits: quality control during construction?
China ranks 1st out of 183 countries with data for 2019.
Is dealing with construction permits: quality control during construction rising or falling in China?
Over the last ten years it is up 50.0%. The long-run trend across the full record is rising.
Where does this China data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.