Dealing with construction permits: Quality control during construction in Rwanda
Rwanda: Dealing with construction permits: Quality control during construction was 3 DB16-20 methodology in 2019. ▲ Rising
Dealing with construction permits: Quality control during construction in Rwanda, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Rwanda recorded 3 DB16-20 methodology for dealing with construction permits: quality control during construction in 2019. That is the highest value across all 6 years on record.
That represents a change of up 50.0% over ten years.
Rwanda ranks 1st of 183 countries on this measure, in the top 10%.
Countries ranked near Rwanda
- 1 China 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for Rwanda
- Merchandise trade 45.9% (2025)
- Food imports 22.4% (2022)
- Manufactures imports 50.0% (2022)
- Merchandise imports 5.07 billion current US$ (2025)
- Food exports 27.2% (2022)
- Manufactures exports 10.4% (2022)
- Merchandise exports 2.45 billion current US$ (2025)
- Commercial service exports 857.32 million current US$ (2024)
- Transport services 48.1% (2024)
- Computer, communications and other services 10.2% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Rwanda?
- Dealing with construction permits: quality control during construction in Rwanda was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Rwanda?
- The highest recorded value was 3 DB16-20 methodology in 2017.
- What is the lowest dealing with construction permits: quality control during construction recorded in Rwanda?
- The lowest recorded value was 2 DB16-20 methodology in 2014.
- How does Rwanda rank for dealing with construction permits: quality control during construction?
- Rwanda ranks 1st out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Rwanda?
- Over the last ten years it is up 50.0%. The long-run trend across the full record is rising.
- Where does this Rwanda data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.