Denmark vs New Zealand: Dealing with construction permits: Quality control during

Denmark
3 DB16-20 methodology
in 2019
New Zealand
3 DB16-20 methodology
in 2019
Denmark rank
1st
New Zealand rank
1st

Dealing with construction permits: Quality control during over time

  • Denmark
  • New Zealand
0123201420162019

How they compare

Denmark currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in New Zealand, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, New Zealand has been ahead every year.

Denmark ranks 1st and New Zealand ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Denmark or New Zealand?
Denmark, at 3 DB16-20 methodology against 3 DB16-20 methodology in New Zealand as of 2019.
What is the difference in dealing with construction permits: quality control during between Denmark and New Zealand?
0 DB16-20 methodology, with Denmark ahead.
How many years of comparable data are there for Denmark and New Zealand?
6 years are reported by both, from 2014 to 2019.
How do Denmark and New Zealand rank globally for dealing with construction permits: quality control during?
Denmark ranks 1st and New Zealand ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Denmark vs New Zealand: Dealing with construction permits: Quality control during. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/denmark/new-zealand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/denmark/new-zealand/">Denmark vs New Zealand: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.