Dealing with construction permits: Quality control during in New Zealand
New Zealand: Dealing with construction permits: Quality control during was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in New Zealand, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
New Zealand recorded 3 DB16-20 methodology for dealing with construction permits: quality control during in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
New Zealand ranks 1st of 185 countries on this measure, in the top 10%.
Countries ranked near New Zealand
- 1 China (People’s Republic of) 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong (China) 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for New Zealand
- Merchandise trade 35.7% (2025)
- Food imports 12.8% (2025)
- Manufactures imports 70.7% (2025)
- Merchandise imports 47.55 billion current US$ (2025)
- Food exports 69.0% (2025)
- Manufactures exports 14.0% (2025)
- Merchandise exports 46.70 billion current US$ (2025)
- Merchandise exports (current US$), per capita 8,770 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.1769 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 10.43 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in New Zealand?
- Dealing with construction permits: quality control during in New Zealand was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in New Zealand?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in New Zealand?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does New Zealand rank for dealing with construction permits: quality control during?
- New Zealand ranks 1st out of 185 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in New Zealand?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this New Zealand data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.