Dealing with construction permits: Quality control during construction in Denmark
Denmark: Dealing with construction permits: Quality control during construction was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Denmark, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during construction in Denmark stood at 3 DB16-20 methodology. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
Denmark ranks 1st of 183 countries on this measure, in the top 10%.
Countries ranked near Denmark
- 1 China 3 DB16-20 methodology compare
- 1 Russian Federation 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Kosovo 2 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for Denmark
- Merchandise trade 61.5% (2025)
- Food imports 13.6% (2025)
- Manufactures imports 75.9% (2025)
- Merchandise imports 136.23 billion current US$ (2025)
- Food exports 17.1% (2025)
- Manufactures exports 73.9% (2025)
- Merchandise exports 148.38 billion current US$ (2025)
- Commercial service exports 128.42 billion current US$ (2024)
- Transport services 39.8% (2024)
- Computer, communications and other services 48.8% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Denmark?
- Dealing with construction permits: quality control during construction in Denmark was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Denmark?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Denmark?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Denmark rank for dealing with construction permits: quality control during construction?
- Denmark ranks 1st out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Denmark?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Denmark data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.