Denmark vs Singapore: Dealing with construction permits: Quality control during

Denmark
3 DB16-20 methodology
in 2019
Singapore
3 DB16-20 methodology
in 2019
Denmark rank
1st
Singapore rank
1st

Dealing with construction permits: Quality control during over time

  • Denmark
  • Singapore
11.522.53201420162019

How they compare

Denmark currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Singapore, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Denmark ahead.

Denmark ranks 1st and Singapore ranks 1st of 185 countries.

Denmark has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Denmark or Singapore?
Denmark, at 3 DB16-20 methodology against 3 DB16-20 methodology in Singapore as of 2019.
What is the difference in dealing with construction permits: quality control during between Denmark and Singapore?
0 DB16-20 methodology, with Denmark ahead.
How many years of comparable data are there for Denmark and Singapore?
6 years are reported by both, from 2014 to 2019.
How do Denmark and Singapore rank globally for dealing with construction permits: quality control during?
Denmark ranks 1st and Singapore ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Denmark vs Singapore: Dealing with construction permits: Quality control during. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/denmark/singapore/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/denmark/singapore/">Denmark vs Singapore: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.