Dealing with construction: Quality control during in Singapore

Singapore: Dealing with construction: Quality control during was 3 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
3 DB16-20 methodology
Change on year
up 50.0%
World rank
1st
of 186 countries
All-time high
3 DB16-20 methodology
in 2019
All-time low
1 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in Singapore, 2014–2019

11.522.532014201620192014: 1 DB16-20 methodology2015: 2 DB16-20 methodology2016: 2 DB16-20 methodology2017: 2 DB16-20 methodology2018: 2 DB16-20 methodology2019: 3 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control during in Singapore is 3 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

That represents a change of up 50.0% on the previous year and up 200.0% over ten years.

That places Singapore 1st out of 186 countries with data for 2019, putting it in the top 10%.

Dealing with construction: Quality control during in Singapore, year by year

Annual values for Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology) in Singapore, 2014 to 2019.
Year DB16-20 methodology Change
2014 1 DB16-20 methodology —
2015 2 DB16-20 methodology +100.0%
2016 2 DB16-20 methodology +0.0%
2017 2 DB16-20 methodology +0.0%
2018 2 DB16-20 methodology +0.0%
2019 3 DB16-20 methodology +50.0%

Singapore compared with similar countries

  • Singapore's 3 DB16-20 methodology is above the median for high income countries, which is 2 DB16-20 methodology, 1.5× the median. (62 countries reporting)
  • Singapore's 3 DB16-20 methodology is above the median for East Asia & Pacific, which is 2 DB16-20 methodology, 1.5× the median. (28 countries reporting)

Countries ranked near Singapore

  1. 1 China 3 DB16-20 methodology compare
  2. 1 Russia 3 DB16-20 methodology compare
  3. 1 Australia 3 DB16-20 methodology compare
  4. 1 Denmark 3 DB16-20 methodology compare
  5. 1 Djibouti 3 DB16-20 methodology compare
  6. 1 Estonia 3 DB16-20 methodology compare
  7. 1 France 3 DB16-20 methodology compare
  8. 1 Hong Kong 3 DB16-20 methodology compare
  9. 1 Ireland 3 DB16-20 methodology compare
  10. 1 Luxembourg 3 DB16-20 methodology compare
  11. 1 Netherlands 3 DB16-20 methodology compare
  12. 1 New Zealand 3 DB16-20 methodology compare
  13. 1 Peru 3 DB16-20 methodology compare
  14. 1 Rwanda 3 DB16-20 methodology compare
  15. 1 Sweden 3 DB16-20 methodology compare
  16. 1 United Arab Emirates 3 DB16-20 methodology compare
  17. 1 United Kingdom 3 DB16-20 methodology compare

See the full ranking of 186 places →

More private sector data for Singapore

All data for Singapore →

Frequently asked questions

What is dealing with construction permits: quality control during in Singapore?
Dealing with construction permits: quality control during in Singapore was 3 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in Singapore?
The highest recorded value was 3 DB16-20 methodology in 2019.
What is the lowest dealing with construction permits: quality control during recorded in Singapore?
The lowest recorded value was 1 DB16-20 methodology in 2014.
How does Singapore rank for dealing with construction permits: quality control during?
Singapore ranks 1st out of 186 countries with data for 2019.
Is dealing with construction permits: quality control during rising or falling in Singapore?
Over the last ten years it is up 200.0%. The long-run trend across the full record is rising.
Where does this Singapore data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in Singapore. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/singapore/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/singapore/">Dealing with construction permits: Quality control during in Singapore</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.