Grenada vs Honduras: Dealing with construction: Quality control during

Grenada
1 DB16-20 methodology
in 2019
Honduras
1 DB16-20 methodology
in 2019
Grenada rank
139th
Honduras rank
139th

Dealing with construction: Quality control during over time

  • Grenada
  • Honduras
00.20.40.60.81201420162019

How they compare

Grenada currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Honduras, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Honduras has been ahead every year.

Grenada ranks 139th and Honduras ranks 139th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Grenada or Honduras?
Grenada, at 1 DB16-20 methodology against 1 DB16-20 methodology in Honduras as of 2019.
What is the difference in dealing with construction permits: quality control during between Grenada and Honduras?
0 DB16-20 methodology, with Grenada ahead.
How many years of comparable data are there for Grenada and Honduras?
6 years are reported by both, from 2014 to 2019.
How do Grenada and Honduras rank globally for dealing with construction permits: quality control during?
Grenada ranks 139th and Honduras ranks 139th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs Honduras: Dealing with construction permits: Quality control during. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/grenada/honduras/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/grenada/honduras/">Grenada vs Honduras: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.