Dealing with construction permits: Quality control during construction in Honduras

Honduras: Dealing with construction permits: Quality control during construction was 1 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
136th
of 183 countries
All-time high
1 DB16-20 methodology
in 2014
All-time low
1 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during construction in Honduras, 2014–2019

00.20.40.60.812014201620192014: 1 DB16-20 methodology2015: 1 DB16-20 methodology2016: 1 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Honduras recorded 1 DB16-20 methodology for dealing with construction permits: quality control during construction in 2019. That is the highest value across all 6 years on record.

That represents a change of unchanged over ten years.

Honduras ranks 136th of 183 countries on this measure, in the middle of the range.

Countries ranked near Honduras

  1. 136 Antigua and Barbuda 1 DB16-20 methodology compare
  2. 136 Burundi 1 DB16-20 methodology compare
  3. 136 Central African Republic 1 DB16-20 methodology compare
  4. 136 Dominica 1 DB16-20 methodology compare
  5. 136 El Salvador 1 DB16-20 methodology compare
  6. 136 Grenada 1 DB16-20 methodology compare
  7. 136 Guyana 1 DB16-20 methodology compare
  8. 136 Haiti 1 DB16-20 methodology compare
  9. 136 Kenya 1 DB16-20 methodology compare
  10. 136 Kiribati 1 DB16-20 methodology compare
  11. 136 Malawi 1 DB16-20 methodology compare
  12. 136 Seychelles 1 DB16-20 methodology compare
  13. 136 Solomon Islands 1 DB16-20 methodology compare
  14. 136 South Sudan 1 DB16-20 methodology compare
  15. 136 Sri Lanka 1 DB16-20 methodology compare
  16. 136 East Timor 1 DB16-20 methodology compare
  17. 136 Togo 1 DB16-20 methodology compare
  18. 136 Trinidad and Tobago 1 DB16-20 methodology compare
  19. 136 Vanuatu 1 DB16-20 methodology compare
  20. 136 Zambia 1 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Honduras

All data for Honduras →

Frequently asked questions

What is dealing with construction permits: quality control during construction in Honduras?
Dealing with construction permits: quality control during construction in Honduras was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during construction recorded in Honduras?
The highest recorded value was 1 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control during construction recorded in Honduras?
The lowest recorded value was 1 DB16-20 methodology in 2014.
How does Honduras rank for dealing with construction permits: quality control during construction?
Honduras ranks 136th out of 183 countries with data for 2019.
Is dealing with construction permits: quality control during construction rising or falling in Honduras?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Honduras data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.