Dealing with construction permits: Quality control during construction in Grenada
Grenada: Dealing with construction permits: Quality control during construction was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Grenada, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during construction in Grenada stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
That places Grenada 136th out of 183 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Grenada
- 136 Antigua and Barbuda 1 DB16-20 methodology compare
- 136 Burundi 1 DB16-20 methodology compare
- 136 Central African Republic 1 DB16-20 methodology compare
- 136 Dominica 1 DB16-20 methodology compare
- 136 El Salvador 1 DB16-20 methodology compare
- 136 Guyana 1 DB16-20 methodology compare
- 136 Haiti 1 DB16-20 methodology compare
- 136 Honduras 1 DB16-20 methodology compare
- 136 Kenya 1 DB16-20 methodology compare
- 136 Kiribati 1 DB16-20 methodology compare
- 136 Malawi 1 DB16-20 methodology compare
- 136 Seychelles 1 DB16-20 methodology compare
- 136 Solomon Islands 1 DB16-20 methodology compare
- 136 South Sudan 1 DB16-20 methodology compare
- 136 Sri Lanka 1 DB16-20 methodology compare
- 136 Timor-Leste 1 DB16-20 methodology compare
- 136 Togo 1 DB16-20 methodology compare
- 136 Trinidad and Tobago 1 DB16-20 methodology compare
- 136 Vanuatu 1 DB16-20 methodology compare
- 136 Zambia 1 DB16-20 methodology compare
More private sector data for Grenada
- Merchandise trade 48.4% (2025)
- Food imports 24.2% (2024)
- Manufactures imports 56.2% (2024)
- Merchandise imports 653.00 million current US$ (2025)
- Food exports 69.1% (2024)
- Manufactures exports 28.6% (2024)
- Merchandise exports 35.00 million current US$ (2025)
- Commercial service exports 754.40 million current US$ (2025)
- Transport services 25.0% (2025)
- Computer, communications and other services 58.6% (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Grenada?
- Dealing with construction permits: quality control during construction in Grenada was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Grenada?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Grenada?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Grenada rank for dealing with construction permits: quality control during construction?
- Grenada ranks 136th out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Grenada?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Grenada data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.