Netherlands vs Peru: Dealing with construction permits: Quality control during
Netherlands
3 DB16-20 methodology
in 2019
Peru
3 DB16-20 methodology
in 2019
Netherlands rank
1st
Peru rank
1st
Dealing with construction permits: Quality control during over time
- Netherlands
- Peru
How they compare
Netherlands currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Peru, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Peru has been ahead every year.
Netherlands ranks 1st and Peru ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Netherlands or Peru?
- Netherlands, at 3 DB16-20 methodology against 3 DB16-20 methodology in Peru as of 2019.
- What is the difference in dealing with construction permits: quality control during between Netherlands and Peru?
- 0 DB16-20 methodology, with Netherlands ahead.
- How many years of comparable data are there for Netherlands and Peru?
- 6 years are reported by both, from 2014 to 2019.
- How do Netherlands and Peru rank globally for dealing with construction permits: quality control during?
- Netherlands ranks 1st and Peru ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.