Netherlands vs Rwanda: Dealing with construction permits: Quality control during

Netherlands
3 DB16-20 methodology
in 2019
Rwanda
3 DB16-20 methodology
in 2019
Netherlands rank
1st
Rwanda rank
1st

Dealing with construction permits: Quality control during over time

  • Netherlands
  • Rwanda
0123201420162019

How they compare

Netherlands currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Netherlands ahead.

Netherlands ranks 1st and Rwanda ranks 1st of 185 countries.

Netherlands has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Netherlands or Rwanda?
Netherlands, at 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda as of 2019.
What is the difference in dealing with construction permits: quality control during between Netherlands and Rwanda?
0 DB16-20 methodology, with Netherlands ahead.
How many years of comparable data are there for Netherlands and Rwanda?
6 years are reported by both, from 2014 to 2019.
How do Netherlands and Rwanda rank globally for dealing with construction permits: quality control during?
Netherlands ranks 1st and Rwanda ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Netherlands vs Rwanda: Dealing with construction permits: Quality control during. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/netherlands/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/netherlands/rwanda/">Netherlands vs Rwanda: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.