New Zealand vs Peru: Dealing with construction permits: Quality control during
New Zealand
3 DB16-20 methodology
in 2019
Peru
3 DB16-20 methodology
in 2019
New Zealand rank
1st
Peru rank
1st
Dealing with construction permits: Quality control during over time
- New Zealand
- Peru
How they compare
New Zealand currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Peru, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Peru has been ahead every year.
New Zealand ranks 1st and Peru ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, New Zealand or Peru?
- New Zealand, at 3 DB16-20 methodology against 3 DB16-20 methodology in Peru as of 2019.
- What is the difference in dealing with construction permits: quality control during between New Zealand and Peru?
- 0 DB16-20 methodology, with New Zealand ahead.
- How many years of comparable data are there for New Zealand and Peru?
- 6 years are reported by both, from 2014 to 2019.
- How do New Zealand and Peru rank globally for dealing with construction permits: quality control during?
- New Zealand ranks 1st and Peru ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.