New Zealand vs United Kingdom: Dealing with construction: Quality control during
New Zealand
3 DB16-20 methodology
in 2019
United Kingdom
3 DB16-20 methodology
in 2019
New Zealand rank
1st
United Kingdom rank
1st
Dealing with construction: Quality control during over time
- New Zealand
- United Kingdom
How they compare
New Zealand currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in United Kingdom, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, United Kingdom has been ahead every year.
New Zealand ranks 1st and United Kingdom ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, New Zealand or United Kingdom?
- New Zealand, at 3 DB16-20 methodology against 3 DB16-20 methodology in United Kingdom as of 2019.
- What is the difference in dealing with construction permits: quality control during between New Zealand and United Kingdom?
- 0 DB16-20 methodology, with New Zealand ahead.
- How many years of comparable data are there for New Zealand and United Kingdom?
- 6 years are reported by both, from 2014 to 2019.
- How do New Zealand and United Kingdom rank globally for dealing with construction permits: quality control during?
- New Zealand ranks 1st and United Kingdom ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.