Dealing with construction permits: Quality control during in United Kingdom

United Kingdom: Dealing with construction permits: Quality control during was 3 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
3 DB16-20 methodology
Change on year
unchanged
World rank
1st
of 185 countries
All-time high
3 DB16-20 methodology
in 2014
All-time low
3 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in United Kingdom, 2014–2019

01232014201620192014: 3 DB16-20 methodology2015: 3 DB16-20 methodology2016: 3 DB16-20 methodology2017: 3 DB16-20 methodology2018: 3 DB16-20 methodology2019: 3 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control during in United Kingdom is 3 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

United Kingdom ranks 1st of 185 countries on this measure, in the top 10%.

Countries ranked near United Kingdom

  1. 1 China (People’s Republic of) 3 DB16-20 methodology compare
  2. 1 Russia 3 DB16-20 methodology compare
  3. 1 Australia 3 DB16-20 methodology compare
  4. 1 Denmark 3 DB16-20 methodology compare
  5. 1 Djibouti 3 DB16-20 methodology compare
  6. 1 Estonia 3 DB16-20 methodology compare
  7. 1 France 3 DB16-20 methodology compare
  8. 1 Hong Kong (China) 3 DB16-20 methodology compare
  9. 1 Ireland 3 DB16-20 methodology compare
  10. 1 Luxembourg 3 DB16-20 methodology compare
  11. 1 Netherlands 3 DB16-20 methodology compare
  12. 1 New Zealand 3 DB16-20 methodology compare
  13. 1 Peru 3 DB16-20 methodology compare
  14. 1 Rwanda 3 DB16-20 methodology compare
  15. 1 Singapore 3 DB16-20 methodology compare
  16. 1 Sweden 3 DB16-20 methodology compare
  17. 1 United Arab Emirates 3 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for United Kingdom

All data for United Kingdom →

Frequently asked questions

What is dealing with construction permits: quality control during in United Kingdom?
Dealing with construction permits: quality control during in United Kingdom was 3 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in United Kingdom?
The highest recorded value was 3 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control during recorded in United Kingdom?
The lowest recorded value was 3 DB16-20 methodology in 2014.
How does United Kingdom rank for dealing with construction permits: quality control during?
United Kingdom ranks 1st out of 185 countries with data for 2019.
Is dealing with construction permits: quality control during rising or falling in United Kingdom?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this United Kingdom data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in United Kingdom. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/united-kingdom/">Dealing with construction permits: Quality control during in United Kingdom</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.