Afghanistan vs Dominican Republic: Dealing with construction permits: Time (days) (Time days)

Afghanistan
199 days
in 2019
Dominican Republic
206 days
in 2019
Afghanistan rank
39th
Dominican Republic rank
36th

Dealing with construction permits: Time (days) (Time days) over time

  • Afghanistan
  • Dominican Republic
0100200300400200520122019

How they compare

Dominican Republic currently reports 206 days against 199 days in Afghanistan, a difference of 7 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Afghanistan ahead.

Afghanistan ranks 39th and Dominican Republic ranks 36th of 188 countries.

Afghanistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Afghanistan Dominican Republic Difference Ahead
2000s 358 days 223 days 135 days Afghanistan
2010s 262.2 days 203.5 days 58.7 days Afghanistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Afghanistan or Dominican Republic?
Dominican Republic, at 206 days against 199 days in Afghanistan as of 2019.
What is the difference in dealing with construction permits: time between Afghanistan and Dominican Republic?
7 days, with Dominican Republic ahead.
How many years of comparable data are there for Afghanistan and Dominican Republic?
15 years are reported by both, from 2005 to 2019.
How do Afghanistan and Dominican Republic rank globally for dealing with construction permits: time?
Afghanistan ranks 39th and Dominican Republic ranks 36th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Afghanistan vs Dominican Republic: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/afghanistan/dominican-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/afghanistan/dominican-republic/">Afghanistan vs Dominican Republic: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.