Dealing with construction permits: Time in Dominican Republic

Dominican Republic: Dealing with construction permits: Time was 206 days in 2019. ▼ Falling

Latest (2019)
206 days
Change on year
unchanged
World rank
34th
of 185 countries
All-time high
223 days
in 2005
All-time low
184 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Dominican Republic, 2005–2019

0501001502002005201220192005: 223 days2006: 223 days2007: 223 days2008: 223 days2009: 223 days2010: 223 days2011: 214 days2012: 214 days2013: 214 days2014: 184 days2015: 184 days2016: 184 days2017: 206 days2018: 206 days2019: 206 days

Source: World Bank. Measured in days.

Analysis

Dominican Republic recorded 206 days for dealing with construction permits: time in 2019.

Compared with earlier readings it is down 7.6% over ten years.

Over the whole period, dealing with construction permits: time in Dominican Republic peaked at 223 days in 2005 and was at its lowest, 184 days, in 2014.

That places Dominican Republic 34th out of 185 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 223 days 223 days 223 days 5
2010s 203.5 days 184 days 223 days 10

Countries ranked near Dominican Republic

  1. 31 Belgium 212 days compare
  2. 32 Guyana 208 days compare
  3. 33 Timor-Leste 207 days compare
  4. 35 Indonesia 200.13 days compare
  5. 36 Israel 200 days compare
  6. 37 Afghanistan 199 days compare

See the full ranking of 187 places →

More private sector data for Dominican Republic

All data for Dominican Republic →

Frequently asked questions

What is dealing with construction permits: time in Dominican Republic?
Dealing with construction permits: time in Dominican Republic was 206 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Dominican Republic?
The highest recorded value was 223 days in 2005.
What is the lowest dealing with construction permits: time recorded in Dominican Republic?
The lowest recorded value was 184 days in 2014.
How does Dominican Republic rank for dealing with construction permits: time?
Dominican Republic ranks 34th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Dominican Republic?
Over the last ten years it is down 7.6%. The long-run trend across the full record is falling.
Where does this Dominican Republic data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.