Albania vs Argentina: Dealing with construction permits: Time

Albania
324 days
in 2019
Argentina
318 days
in 2019
Albania rank
6th
Argentina rank
7th

Dealing with construction permits: Time over time

  • Albania
  • Argentina
0100200300400200520122019

How they compare

Albania currently reports 324 days against 318 days in Argentina, a difference of 6 days.

The two have swapped places 2 times across 11 shared years of data; in 2005 it was Albania ahead.

Albania ranks 6th and Argentina ranks 7th of 185 countries.

Across the 2 decades both report, Albania averaged higher in 1 and Argentina in 1.

Head to head by decade

Decade Albania Argentina Difference Ahead
2000s 389.4 days 365 days 24.4 days Albania
2010s 330.33 days 357.42 days 27.08 days Argentina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Albania or Argentina?
Albania, at 324 days against 318 days in Argentina as of 2019.
What is the difference in dealing with construction permits: time between Albania and Argentina?
6 days, with Albania ahead.
How many years of comparable data are there for Albania and Argentina?
11 years are reported by both, from 2005 to 2019.
How do Albania and Argentina rank globally for dealing with construction permits: time?
Albania ranks 6th and Argentina ranks 7th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.