Dealing with construction permits: Time in Albania

Albania: Dealing with construction permits: Time was 324 days in 2019. ▼ Falling

Latest (2019)
324 days
Change on year
unchanged
World rank
6th
of 185 countries
All-time high
390 days
in 2005
All-time low
297 days
in 2014
Years of data
11
2005–2019

Dealing with construction permits: Time in Albania, 2005–2019

01002003004002005201220192005: 390 days2006: 390 days2007: 389 days2008: 389 days2009: 389 days2010: 389 days2014: 297 days2016: 324 days2017: 324 days2018: 324 days2019: 324 days

Source: World Bank. Measured in days.

Analysis

Albania recorded 324 days for dealing with construction permits: time in 2019.

That represents a change of down 16.7% over ten years.

Over the whole period, dealing with construction permits: time in Albania peaked at 390 days in 2005 and was at its lowest, 297 days, in 2014.

Albania ranks 6th of 185 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 11 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 389.4 days 389 days 390 days 5
2010s 330.33 days 297 days 389 days 6

Countries ranked near Albania

  1. 3 Venezuela 434 days compare
  2. 4 Barbados 377 days compare
  3. 5 Brazil 338.37 days compare
  4. 7 Argentina 318 days compare
  5. 8 El Salvador 310 days compare
  6. 9 Slovakia 300 days compare

See the full ranking of 187 places →

More private sector data for Albania

All data for Albania →

Frequently asked questions

What is dealing with construction permits: time in Albania?
Dealing with construction permits: time in Albania was 324 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Albania?
The highest recorded value was 390 days in 2005.
What is the lowest dealing with construction permits: time recorded in Albania?
The lowest recorded value was 297 days in 2014.
How does Albania rank for dealing with construction permits: time?
Albania ranks 6th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Albania?
Over the last ten years it is down 16.7%. The long-run trend across the full record is falling.
Where does this Albania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.