Dealing with construction permits: Time in Albania
Albania: Dealing with construction permits: Time was 324 days in 2019. ▼ Falling
Dealing with construction permits: Time in Albania, 2005–2019
Source: World Bank. Measured in days.
Analysis
Albania recorded 324 days for dealing with construction permits: time in 2019.
That represents a change of down 16.7% over ten years.
Over the whole period, dealing with construction permits: time in Albania peaked at 390 days in 2005 and was at its lowest, 297 days, in 2014.
Albania ranks 6th of 185 countries on this measure, in the top 10%.
The long-run direction has been consistently falling across the 11 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 389.4 days | 389 days | 390 days | 5 |
| 2010s | 330.33 days | 297 days | 389 days | 6 |
Countries ranked near Albania
More private sector data for Albania
- Merchandise trade 47.9% (2025)
- Food imports 16.6% (2024)
- Manufactures imports 63.2% (2024)
- Merchandise imports 10.28 billion current US$ (2025)
- Food exports 13.4% (2024)
- Manufactures exports 54.1% (2024)
- Merchandise exports 4.35 billion current US$ (2025)
- Commercial service exports 9.60 billion current US$ (2025)
- Transport services 10.5% (2025)
- Computer, communications and other services 9.5% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Albania?
- Dealing with construction permits: time in Albania was 324 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Albania?
- The highest recorded value was 390 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Albania?
- The lowest recorded value was 297 days in 2014.
- How does Albania rank for dealing with construction permits: time?
- Albania ranks 6th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Albania?
- Over the last ten years it is down 16.7%. The long-run trend across the full record is falling.
- Where does this Albania data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.