Dealing with construction permits: Time (days) (Time days) in Argentina

Argentina: Dealing with construction permits: Time was 318 days in 2019. ▬ Flat

Latest (2019)
318 days
Change on year
down 12.9%
World rank
7th
of 188 countries
All-time high
366.5 days
in 2014
All-time low
318 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Argentina, 2005–2019

01002003004002005201220192005: 365 days2006: 365 days2007: 365 days2008: 365 days2009: 365 days2010: 365 days2011: 365 days2012: 365 days2013: 365 days2014: 366.5 days2015: 366 days2016: 365 days2017: 365 days2018: 365 days2019: 318 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Argentina is 318 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 12.9% on the previous year and down 12.9% over ten years.

Over the whole period, dealing with construction permits: time in Argentina peaked at 366.5 days in 2014 and was at its lowest, 318 days, in 2019.

That places Argentina 7th out of 188 countries with data for 2019, putting it in the top 10%.

Dealing with construction permits: Time in Argentina, year by year

Annual values for Dealing with construction permits: Time (days) in Argentina, 2005 to 2019.
Year days Change
2005 365 days —
2006 365 days +0.0%
2007 365 days +0.0%
2008 365 days +0.0%
2009 365 days +0.0%
2010 365 days +0.0%
2011 365 days +0.0%
2012 365 days +0.0%
2013 365 days +0.0%
2014 366.5 days +0.4%
2015 366 days -0.1%
2016 365 days -0.3%
2017 365 days +0.0%
2018 365 days +0.0%
2019 318 days -12.9%

Argentina compared with similar countries

  • Argentina's 318 days is above the median for upper middle income countries, which is 131 days, 2.4× the median. (55 countries reporting)
  • Argentina's 318 days is above the median for Latin America & Caribbean, which is 165 days, 1.9× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 365 days 365 days 365 days 5
2010s 360.55 days 318 days 366.5 days 10

Countries ranked near Argentina

  1. 4 Barbados 377 days compare
  2. 5 Brazil 338.37 days compare
  3. 6 Albania 324 days compare
  4. 8 El Salvador 310 days compare
  5. 9 Slovakia 300 days compare
  6. 10 Moldova 278 days compare

See the full ranking of 188 places →

More private sector data for Argentina

All data for Argentina →

Frequently asked questions

What is dealing with construction permits: time in Argentina?
Dealing with construction permits: time in Argentina was 318 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Argentina?
The highest recorded value was 366.5 days in 2014.
What is the lowest dealing with construction permits: time recorded in Argentina?
The lowest recorded value was 318 days in 2019.
How does Argentina rank for dealing with construction permits: time?
Argentina ranks 7th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Argentina?
Over the last ten years it is down 12.9%. The long-run trend across the full record is flat.
Where does this Argentina data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Argentina. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/argentina/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/argentina/">Dealing with construction permits: Time in Argentina</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.