Dealing with construction permits: Time in Argentina
Argentina: Dealing with construction permits: Time was 318 days in 2019. ▬ Flat
Dealing with construction permits: Time in Argentina, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Argentina is 318 days, measured in 2019. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 12.9% on the previous year and down 12.9% over ten years.
Over the whole period, dealing with construction permits: time in Argentina peaked at 366.5 days in 2014 and was at its lowest, 318 days, in 2019.
That places Argentina 7th out of 185 countries with data for 2019, putting it in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 365 days | 365 days | 365 days | 5 |
| 2010s | 360.55 days | 318 days | 366.5 days | 10 |
Countries ranked near Argentina
More private sector data for Argentina
- Merchandise trade 23.8% (2025)
- Food imports 9.1% (2024)
- Manufactures imports 79.6% (2024)
- Merchandise imports 75.79 billion current US$ (2025)
- Food exports 49.0% (2024)
- Manufactures exports 13.3% (2024)
- Merchandise exports 87.11 billion current US$ (2025)
- Commercial service exports 17.79 billion current US$ (2025)
- Transport services 20.5% (2025)
- Computer, communications and other services 34.5% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Argentina?
- Dealing with construction permits: time in Argentina was 318 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Argentina?
- The highest recorded value was 366.5 days in 2014.
- What is the lowest dealing with construction permits: time recorded in Argentina?
- The lowest recorded value was 318 days in 2019.
- How does Argentina rank for dealing with construction permits: time?
- Argentina ranks 7th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Argentina?
- Over the last ten years it is down 12.9%. The long-run trend across the full record is flat.
- Where does this Argentina data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.