Albania vs El Salvador: Dealing with construction permits: Time

Albania
324 days
in 2019
El Salvador
310 days
in 2019
Albania rank
6th
El Salvador rank
8th

Dealing with construction permits: Time over time

  • Albania
  • El Salvador
100200300400200520122019

How they compare

Albania currently reports 324 days against 310 days in El Salvador, a difference of 14 days.

The two have swapped places 2 times across 11 shared years of data; in 2005 it was Albania ahead.

Albania ranks 6th and El Salvador ranks 8th of 187 countries.

Albania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Albania El Salvador Difference Ahead
2000s 389.4 days 176.2 days 213.2 days Albania
2010s 330.33 days 220.5 days 109.83 days Albania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Albania or El Salvador?
Albania, at 324 days against 310 days in El Salvador as of 2019.
What is the difference in dealing with construction permits: time between Albania and El Salvador?
14 days, with Albania ahead.
How many years of comparable data are there for Albania and El Salvador?
11 years are reported by both, from 2005 to 2019.
How do Albania and El Salvador rank globally for dealing with construction permits: time?
Albania ranks 6th and El Salvador ranks 8th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Albania vs El Salvador: Dealing with construction permits: Time. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/albania/el-salvador/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/albania/el-salvador/">Albania vs El Salvador: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.