Dealing with construction permits: Time in El Salvador

El Salvador: Dealing with construction permits: Time was 310 days in 2019. ▲ Rising

Latest (2019)
310 days
Change on year
unchanged
World rank
8th
of 185 countries
All-time high
324 days
in 2017
All-time low
117 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in El Salvador, 2005–2019

01002003002005201220192005: 184 days2006: 184 days2007: 184 days2008: 184 days2009: 145 days2010: 145 days2011: 145 days2012: 145 days2013: 117 days2014: 117 days2015: 117 days2016: 117 days2017: 324 days2018: 310 days2019: 310 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in El Salvador stood at 310 days.

That represents a change of up 113.8% over ten years.

Over the whole period, dealing with construction permits: time in El Salvador peaked at 324 days in 2017 and was at its lowest, 117 days, in 2013.

That places El Salvador 8th out of 185 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 176.2 days 145 days 184 days 5
2010s 184.7 days 117 days 324 days 10

Countries ranked near El Salvador

  1. 5 Brazil 338.37 days compare
  2. 6 Albania 324 days compare
  3. 7 Argentina 318 days compare
  4. 9 Slovakia 300 days compare
  5. 10 Moldova 278 days compare
  6. 11 Lebanon 276 days compare

See the full ranking of 187 places →

More private sector data for El Salvador

All data for El Salvador →

Frequently asked questions

What is dealing with construction permits: time in El Salvador?
Dealing with construction permits: time in El Salvador was 310 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in El Salvador?
The highest recorded value was 324 days in 2017.
What is the lowest dealing with construction permits: time recorded in El Salvador?
The lowest recorded value was 117 days in 2013.
How does El Salvador rank for dealing with construction permits: time?
El Salvador ranks 8th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in El Salvador?
Over the last ten years it is up 113.8%. The long-run trend across the full record is rising.
Where does this El Salvador data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.