Albania vs Slovakia: Dealing with construction permits: Time

Albania
324 days
in 2019
Slovakia
300 days
in 2019
Albania rank
6th
Slovakia rank
9th

Dealing with construction permits: Time over time

  • Albania
  • Slovakia
0100200300400200520122019

How they compare

Albania currently reports 324 days against 300 days in Slovakia, a difference of 24 days.

That makes Albania's figure about 1.1 times Slovakia's.

The two have swapped places 2 times across 11 shared years of data; in 2005 it was Albania ahead.

Albania ranks 6th and Slovakia ranks 9th of 185 countries.

Albania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Albania Slovakia Difference Ahead
2000s 389.4 days 300 days 89.4 days Albania
2010s 330.33 days 300 days 30.33 days Albania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Albania or Slovakia?
Albania, at 324 days against 300 days in Slovakia as of 2019.
What is the difference in dealing with construction permits: time between Albania and Slovakia?
24 days, with Albania ahead.
How many years of comparable data are there for Albania and Slovakia?
11 years are reported by both, from 2005 to 2019.
How do Albania and Slovakia rank globally for dealing with construction permits: time?
Albania ranks 6th and Slovakia ranks 9th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.