Dealing with construction permits: Time in Slovakia
Slovakia: Dealing with construction permits: Time was 300 days in 2019. ▬ Flat
Dealing with construction permits: Time in Slovakia, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Slovakia stood at 300 days. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Slovakia peaked at 300 days in 2005 and was at its lowest, 300 days, in 2005.
That places Slovakia 9th out of 185 countries with data for 2019, putting it in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 300 days | 300 days | 300 days | 5 |
| 2010s | 300 days | 300 days | 300 days | 10 |
Countries ranked near Slovakia
More private sector data for Slovakia
- Merchandise trade 160.5% (2025)
- Food imports 7.3% (2024)
- Manufactures imports 80.7% (2024)
- Merchandise imports 122.60 billion current US$ (2025)
- Food exports 4.7% (2024)
- Manufactures exports 88.6% (2024)
- Merchandise exports 125.44 billion current US$ (2025)
- Commercial service exports 14.64 billion current US$ (2025)
- Transport services 30.2% (2025)
- Computer, communications and other services 45.7% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Slovakia?
- Dealing with construction permits: time in Slovakia was 300 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Slovakia?
- The highest recorded value was 300 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Slovakia?
- The lowest recorded value was 300 days in 2005.
- How does Slovakia rank for dealing with construction permits: time?
- Slovakia ranks 9th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Slovakia?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Slovakia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.