Algeria vs Ecuador: Dealing with construction permits: Time

Algeria
131 days
in 2019
Ecuador
132 days
in 2019
Algeria rank
101st
Ecuador rank
98th

Dealing with construction permits: Time over time

  • Algeria
  • Ecuador
050100150200250200520122019

How they compare

Ecuador currently reports 132 days against 131 days in Algeria, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Algeria ahead.

Algeria ranks 101st and Ecuador ranks 98th of 185 countries.

Algeria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Algeria Ecuador Difference Ahead
2000s 218 days 132 days 86 days Algeria
2010s 185 days 132 days 53 days Algeria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Algeria or Ecuador?
Ecuador, at 132 days against 131 days in Algeria as of 2019.
What is the difference in dealing with construction permits: time between Algeria and Ecuador?
1 days, with Ecuador ahead.
How many years of comparable data are there for Algeria and Ecuador?
15 years are reported by both, from 2005 to 2019.
How do Algeria and Ecuador rank globally for dealing with construction permits: time?
Algeria ranks 101st and Ecuador ranks 98th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.