Dealing with construction permits: Time in Algeria
Algeria: Dealing with construction permits: Time was 131 days in 2019. ▼ Falling
Dealing with construction permits: Time in Algeria, 2005–2019
Source: World Bank. Measured in days.
Analysis
Algeria recorded 131 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 39.9% over ten years.
Over the whole period, dealing with construction permits: time in Algeria peaked at 226 days in 2015 and was at its lowest, 131 days, in 2018.
Algeria ranks 101st of 185 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 218 days | 218 days | 218 days | 5 |
| 2010s | 185 days | 131 days | 226 days | 10 |
Countries ranked near Algeria
More private sector data for Algeria
- Merchandise trade 33.3% (2025)
- Food imports 20.2% (2017)
- Manufactures imports 73.0% (2017)
- Merchandise imports 50.10 billion current US$ (2025)
- Food exports 1.0% (2017)
- Manufactures exports 2.7% (2017)
- Merchandise exports 45.40 billion current US$ (2025)
- Commercial service exports 4.17 billion current US$ (2024)
- Transport services 50.8% (2024)
- Computer, communications and other services 37.8% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Algeria?
- Dealing with construction permits: time in Algeria was 131 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Algeria?
- The highest recorded value was 226 days in 2015.
- What is the lowest dealing with construction permits: time recorded in Algeria?
- The lowest recorded value was 131 days in 2018.
- How does Algeria rank for dealing with construction permits: time?
- Algeria ranks 101st out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Algeria?
- Over the last ten years it is down 39.9%. The long-run trend across the full record is falling.
- Where does this Algeria data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.