Dealing with construction permits: Time in Ecuador

Ecuador: Dealing with construction permits: Time was 132 days in 2019. ▬ Flat

Latest (2019)
132 days
Change on year
unchanged
World rank
98th
of 185 countries
All-time high
132 days
in 2005
All-time low
132 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Ecuador, 2005–2019

0501001502005201220192005: 132 days2006: 132 days2007: 132 days2008: 132 days2009: 132 days2010: 132 days2011: 132 days2012: 132 days2013: 132 days2014: 132 days2015: 132 days2016: 132 days2017: 132 days2018: 132 days2019: 132 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Ecuador is 132 days, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Ecuador peaked at 132 days in 2005 and was at its lowest, 132 days, in 2005.

That places Ecuador 98th out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 132 days 132 days 132 days 5
2010s 132 days 132 days 132 days 10

Countries ranked near Ecuador

  1. 96 Ethiopia 136 days compare
  2. 97 Tunisia 133 days compare
  3. 98 Colombia 132 days compare
  4. 98 Honduras 132 days compare
  5. 101 Algeria 131 days compare
  6. 101 South Sudan 131 days compare

See the full ranking of 187 places →

More private sector data for Ecuador

All data for Ecuador →

Frequently asked questions

What is dealing with construction permits: time in Ecuador?
Dealing with construction permits: time in Ecuador was 132 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ecuador?
The highest recorded value was 132 days in 2005.
What is the lowest dealing with construction permits: time recorded in Ecuador?
The lowest recorded value was 132 days in 2005.
How does Ecuador rank for dealing with construction permits: time?
Ecuador ranks 98th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ecuador?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Ecuador data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.