Dealing with construction permits: Time in Ecuador
Ecuador: Dealing with construction permits: Time was 132 days in 2019. ▬ Flat
Dealing with construction permits: Time in Ecuador, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Ecuador is 132 days, measured in 2019. That is the highest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Ecuador peaked at 132 days in 2005 and was at its lowest, 132 days, in 2005.
That places Ecuador 98th out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 132 days | 132 days | 132 days | 5 |
| 2010s | 132 days | 132 days | 132 days | 10 |
Countries ranked near Ecuador
More private sector data for Ecuador
- Merchandise trade 53.6% (2025)
- Food imports 12.2% (2024)
- Manufactures imports 59.2% (2024)
- Merchandise imports 32.65 billion current US$ (2025)
- Food exports 53.7% (2024)
- Manufactures exports 4.9% (2024)
- Merchandise exports 37.15 billion current US$ (2025)
- Commercial service exports 4.02 billion current US$ (2025)
- Transport services 35.5% (2025)
- Computer, communications and other services 27.1% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Ecuador?
- Dealing with construction permits: time in Ecuador was 132 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Ecuador?
- The highest recorded value was 132 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Ecuador?
- The lowest recorded value was 132 days in 2005.
- How does Ecuador rank for dealing with construction permits: time?
- Ecuador ranks 98th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Ecuador?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Ecuador data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.