Dealing with construction permits: Time (days) (Time days) in Ecuador

Ecuador: Dealing with construction permits: Time was 132 days in 2019. ▬ Flat

Latest (2019)
132 days
Change on year
unchanged
World rank
101st
of 188 countries
All-time high
132 days
in 2005
All-time low
132 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Ecuador, 2005–2019

0501001502005201220192005: 132 days2006: 132 days2007: 132 days2008: 132 days2009: 132 days2010: 132 days2011: 132 days2012: 132 days2013: 132 days2014: 132 days2015: 132 days2016: 132 days2017: 132 days2018: 132 days2019: 132 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Ecuador is 132 days, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Ecuador peaked at 132 days in 2005 and was at its lowest, 132 days, in 2005.

That places Ecuador 101st out of 188 countries with data for 2019, putting it in the middle of the range.

Dealing with construction permits: Time in Ecuador, year by year

Annual values for Dealing with construction permits: Time (days) in Ecuador, 2005 to 2019.
Year days Change
2005 132 days —
2006 132 days +0.0%
2007 132 days +0.0%
2008 132 days +0.0%
2009 132 days +0.0%
2010 132 days +0.0%
2011 132 days +0.0%
2012 132 days +0.0%
2013 132 days +0.0%
2014 132 days +0.0%
2015 132 days +0.0%
2016 132 days +0.0%
2017 132 days +0.0%
2018 132 days +0.0%
2019 132 days +0.0%

Ecuador compared with similar countries

  • Ecuador's 132 days is above the median for upper middle income countries, which is 131 days, 1.0× the median. (55 countries reporting)
  • Ecuador's 132 days is below the median for Latin America & Caribbean, which is 165 days, 80% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 132 days 132 days 132 days 5
2010s 132 days 132 days 132 days 10

Countries ranked near Ecuador

  1. 99 Ethiopia 136 days compare
  2. 100 Tunisia 133 days compare
  3. 101 Colombia 132 days compare
  4. 101 Honduras 132 days compare
  5. 104 Algeria 131 days compare
  6. 104 South Sudan 131 days compare

See the full ranking of 188 places →

More private sector data for Ecuador

All data for Ecuador →

Frequently asked questions

What is dealing with construction permits: time in Ecuador?
Dealing with construction permits: time in Ecuador was 132 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ecuador?
The highest recorded value was 132 days in 2005.
What is the lowest dealing with construction permits: time recorded in Ecuador?
The lowest recorded value was 132 days in 2005.
How does Ecuador rank for dealing with construction permits: time?
Ecuador ranks 101st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ecuador?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Ecuador data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Ecuador. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ecuador/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ecuador/">Dealing with construction permits: Time in Ecuador</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.