Angola vs Italy: Dealing with construction permits: Time

Angola
184 days
in 2019
Italy
189.5 days
in 2019
Angola rank
46th
Italy rank
43rd

Dealing with construction permits: Time over time

  • Angola
  • Italy
0100200300400200520122019

How they compare

Italy currently reports 189.5 days against 184 days in Angola, a difference of 5.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Angola ahead.

Angola ranks 46th and Italy ranks 43rd of 185 countries.

Across the 2 decades both report, Angola averaged higher in 1 and Italy in 1.

Head to head by decade

Decade Angola Italy Difference Ahead
2000s 303.4 days 219 days 84.4 days Angola
2010s 205 days 210.15 days 5.15 days Italy

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Angola or Italy?
Italy, at 189.5 days against 184 days in Angola as of 2019.
What is the difference in dealing with construction permits: time between Angola and Italy?
5.5 days, with Italy ahead.
How many years of comparable data are there for Angola and Italy?
15 years are reported by both, from 2005 to 2019.
How do Angola and Italy rank globally for dealing with construction permits: time?
Angola ranks 46th and Italy ranks 43rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.