Dealing with construction permits: Time in Italy

Italy: Dealing with construction permits: Time was 189.5 days in 2019. ▼ Falling

Latest (2019)
189.5 days
Change on year
unchanged
World rank
43rd
of 185 countries
All-time high
219 days
in 2005
All-time low
189.5 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Italy, 2005–2019

0501001502002005201220192005: 219 days2006: 219 days2007: 219 days2008: 219 days2009: 219 days2010: 219 days2011: 219 days2012: 219 days2013: 219 days2014: 219 days2015: 219 days2016: 219 days2017: 189.5 days2018: 189.5 days2019: 189.5 days

Source: World Bank. Measured in days.

Analysis

Italy recorded 189.5 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 13.5% over ten years.

Over the whole period, dealing with construction permits: time in Italy peaked at 219 days in 2005 and was at its lowest, 189.5 days, in 2017.

That places Italy 43rd out of 185 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 219 days 219 days 219 days 5
2010s 210.15 days 189.5 days 219 days 10

Countries ranked near Italy

  1. 40 Hungary 192.5 days compare
  2. 41 Latvia 192 days compare
  3. 42 Dominica 191 days compare
  4. 44 Zambia 188 days compare
  5. 45 Kiribati 185 days compare
  6. 46 Angola 184 days compare
  7. 46 Tanzania 184 days compare
  8. 46 Yemen 184 days compare

See the full ranking of 187 places →

More private sector data for Italy

All data for Italy →

Frequently asked questions

What is dealing with construction permits: time in Italy?
Dealing with construction permits: time in Italy was 189.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Italy?
The highest recorded value was 219 days in 2005.
What is the lowest dealing with construction permits: time recorded in Italy?
The lowest recorded value was 189.5 days in 2017.
How does Italy rank for dealing with construction permits: time?
Italy ranks 43rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Italy?
Over the last ten years it is down 13.5%. The long-run trend across the full record is falling.
Where does this Italy data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.