Dealing with construction permits: Time in Angola
Angola: Dealing with construction permits: Time was 184 days in 2019. ▼ Falling
Dealing with construction permits: Time in Angola, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Angola is 184 days, measured in 2019. That is the lowest value across all 15 years on record.
That represents a change of down 33.1% over ten years.
Over the whole period, dealing with construction permits: time in Angola peaked at 373 days in 2005 and was at its lowest, 184 days, in 2017.
That places Angola 46th out of 185 countries with data for 2019, putting it in the top quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 303.4 days | 275 days | 373 days | 5 |
| 2010s | 205 days | 184 days | 214 days | 10 |
Countries ranked near Angola
More private sector data for Angola
- Merchandise trade 38.8% (2025)
- Food imports 15.7% (2024)
- Manufactures imports 62.6% (2024)
- Merchandise imports 14.96 billion current US$ (2025)
- Food exports 0.4% (2024)
- Manufactures exports 1.1% (2024)
- Merchandise exports 32.49 billion current US$ (2025)
- Commercial service exports 116.50 million current US$ (2025)
- Transport services 40.5% (2025)
- Computer, communications and other services 35.6% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Angola?
- Dealing with construction permits: time in Angola was 184 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Angola?
- The highest recorded value was 373 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Angola?
- The lowest recorded value was 184 days in 2017.
- How does Angola rank for dealing with construction permits: time?
- Angola ranks 46th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Angola?
- Over the last ten years it is down 33.1%. The long-run trend across the full record is falling.
- Where does this Angola data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.