Antigua and Barbuda vs Equatorial Guinea: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Antigua and Barbuda
- Equatorial Guinea
How they compare
Antigua and Barbuda currently reports 144 days against 144 days in Equatorial Guinea, a difference of 0 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Antigua and Barbuda ahead.
Antigua and Barbuda ranks 85th and Equatorial Guinea ranks 85th of 185 countries.
Equatorial Guinea has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Antigua and Barbuda | Equatorial Guinea | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 140.4 days | 144 days | 3.6 days | Equatorial Guinea |
| 2010s | 142.2 days | 144 days | 1.8 days | Equatorial Guinea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Antigua and Barbuda or Equatorial Guinea?
- Antigua and Barbuda, at 144 days against 144 days in Equatorial Guinea as of 2019.
- What is the difference in dealing with construction permits: time between Antigua and Barbuda and Equatorial Guinea?
- 0 days, with Antigua and Barbuda ahead.
- How many years of comparable data are there for Antigua and Barbuda and Equatorial Guinea?
- 15 years are reported by both, from 2005 to 2019.
- How do Antigua and Barbuda and Equatorial Guinea rank globally for dealing with construction permits: time?
- Antigua and Barbuda ranks 85th and Equatorial Guinea ranks 85th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.