Dealing with construction permits: Time in Antigua and Barbuda

Antigua and Barbuda: Dealing with construction permits: Time was 144 days in 2019. ▬ Flat

Latest (2019)
144 days
Change on year
unchanged
World rank
85th
of 185 countries
All-time high
150 days
in 2005
All-time low
138 days
in 2006
Years of data
15
2005–2019

Dealing with construction permits: Time in Antigua and Barbuda, 2005–2019

0501001502005201220192005: 150 days2006: 138 days2007: 138 days2008: 138 days2009: 138 days2010: 138 days2011: 138 days2012: 138 days2013: 144 days2014: 144 days2015: 144 days2016: 144 days2017: 144 days2018: 144 days2019: 144 days

Source: World Bank. Measured in days.

Analysis

Antigua and Barbuda recorded 144 days for dealing with construction permits: time in 2019.

Compared with earlier readings it is up 4.3% over ten years.

Over the whole period, dealing with construction permits: time in Antigua and Barbuda peaked at 150 days in 2005 and was at its lowest, 138 days, in 2006.

That places Antigua and Barbuda 85th out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 140.4 days 138 days 150 days 5
2010s 142.2 days 138 days 144 days 10

Countries ranked near Antigua and Barbuda

  1. 82 Croatia 146 days compare
  2. 82 Grenada 146 days compare
  3. 84 San Marino 145.5 days compare
  4. 85 Equatorial Guinea 144 days compare
  5. 87 Guinea-Bissau 143 days compare
  6. 88 Belize 142 days compare

See the full ranking of 187 places →

More private sector data for Antigua and Barbuda

All data for Antigua and Barbuda →

Frequently asked questions

What is dealing with construction permits: time in Antigua and Barbuda?
Dealing with construction permits: time in Antigua and Barbuda was 144 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Antigua and Barbuda?
The highest recorded value was 150 days in 2005.
What is the lowest dealing with construction permits: time recorded in Antigua and Barbuda?
The lowest recorded value was 138 days in 2006.
How does Antigua and Barbuda rank for dealing with construction permits: time?
Antigua and Barbuda ranks 85th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Antigua and Barbuda?
Over the last ten years it is up 4.3%. The long-run trend across the full record is flat.
Where does this Antigua and Barbuda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.