Dealing with construction permits: Time in Antigua and Barbuda
Antigua and Barbuda: Dealing with construction permits: Time was 144 days in 2019. ▬ Flat
Dealing with construction permits: Time in Antigua and Barbuda, 2005–2019
Source: World Bank. Measured in days.
Analysis
Antigua and Barbuda recorded 144 days for dealing with construction permits: time in 2019.
Compared with earlier readings it is up 4.3% over ten years.
Over the whole period, dealing with construction permits: time in Antigua and Barbuda peaked at 150 days in 2005 and was at its lowest, 138 days, in 2006.
That places Antigua and Barbuda 85th out of 185 countries with data for 2019, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 140.4 days | 138 days | 150 days | 5 |
| 2010s | 142.2 days | 138 days | 144 days | 10 |
Countries ranked near Antigua and Barbuda
- 82 Croatia 146 days compare
- 82 Grenada 146 days compare
- 84 San Marino 145.5 days compare
- 85 Equatorial Guinea 144 days compare
- 87 Guinea-Bissau 143 days compare
- 88 Belize 142 days compare
More private sector data for Antigua and Barbuda
- Merchandise trade 41.5% (2025)
- Food imports 27.7% (2024)
- Manufactures imports 68.5% (2024)
- Merchandise imports 938.00 million current US$ (2025)
- Food exports 84.7% (2024)
- Manufactures exports 14.8% (2024)
- Merchandise exports 32.00 million current US$ (2025)
- Commercial service exports 1.21 billion current US$ (2025)
- Transport services 21.3% (2025)
- Computer, communications and other services 52.9% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Antigua and Barbuda?
- Dealing with construction permits: time in Antigua and Barbuda was 144 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Antigua and Barbuda?
- The highest recorded value was 150 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Antigua and Barbuda?
- The lowest recorded value was 138 days in 2006.
- How does Antigua and Barbuda rank for dealing with construction permits: time?
- Antigua and Barbuda ranks 85th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Antigua and Barbuda?
- Over the last ten years it is up 4.3%. The long-run trend across the full record is flat.
- Where does this Antigua and Barbuda data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.