Dealing with construction permits: Time in Equatorial Guinea
Equatorial Guinea: Dealing with construction permits: Time was 144 days in 2019. ▬ Flat
Dealing with construction permits: Time in Equatorial Guinea, 2005–2019
Source: World Bank. Measured in days.
Analysis
Equatorial Guinea recorded 144 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Equatorial Guinea peaked at 144 days in 2005 and was at its lowest, 144 days, in 2005.
Equatorial Guinea ranks 85th of 185 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 144 days | 144 days | 144 days | 5 |
| 2010s | 144 days | 144 days | 144 days | 10 |
Countries ranked near Equatorial Guinea
- 82 Croatia 146 days compare
- 82 Grenada 146 days compare
- 84 San Marino 145.5 days compare
- 85 Antigua and Barbuda 144 days compare
- 87 Guinea-Bissau 143 days compare
- 88 Belize 142 days compare
More private sector data for Equatorial Guinea
- Merchandise trade 33.5% (2025)
- Food imports 31.8% (1983)
- Manufactures imports 64.2% (1983)
- Merchandise imports 1.70 billion current US$ (2025)
- Food exports 57.9% (1983)
- Manufactures exports 4.0% (1983)
- Merchandise exports 2.60 billion current US$ (2025)
- Commercial service exports 4.88 million current US$ (1996)
- Commercial service imports 184.58 million current US$ (1996)
- Merchandise imports from economies in the Arab World 2.9% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Equatorial Guinea?
- Dealing with construction permits: time in Equatorial Guinea was 144 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Equatorial Guinea?
- The highest recorded value was 144 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Equatorial Guinea?
- The lowest recorded value was 144 days in 2005.
- How does Equatorial Guinea rank for dealing with construction permits: time?
- Equatorial Guinea ranks 85th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Equatorial Guinea?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Equatorial Guinea data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.