Dealing with construction permits: Time in Equatorial Guinea

Equatorial Guinea: Dealing with construction permits: Time was 144 days in 2019. ▬ Flat

Latest (2019)
144 days
Change on year
unchanged
World rank
85th
of 185 countries
All-time high
144 days
in 2005
All-time low
144 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Equatorial Guinea, 2005–2019

0501001502005201220192005: 144 days2006: 144 days2007: 144 days2008: 144 days2009: 144 days2010: 144 days2011: 144 days2012: 144 days2013: 144 days2014: 144 days2015: 144 days2016: 144 days2017: 144 days2018: 144 days2019: 144 days

Source: World Bank. Measured in days.

Analysis

Equatorial Guinea recorded 144 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Equatorial Guinea peaked at 144 days in 2005 and was at its lowest, 144 days, in 2005.

Equatorial Guinea ranks 85th of 185 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 144 days 144 days 144 days 5
2010s 144 days 144 days 144 days 10

Countries ranked near Equatorial Guinea

  1. 82 Croatia 146 days compare
  2. 82 Grenada 146 days compare
  3. 84 San Marino 145.5 days compare
  4. 85 Antigua and Barbuda 144 days compare
  5. 87 Guinea-Bissau 143 days compare
  6. 88 Belize 142 days compare

See the full ranking of 187 places →

More private sector data for Equatorial Guinea

All data for Equatorial Guinea →

Frequently asked questions

What is dealing with construction permits: time in Equatorial Guinea?
Dealing with construction permits: time in Equatorial Guinea was 144 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Equatorial Guinea?
The highest recorded value was 144 days in 2005.
What is the lowest dealing with construction permits: time recorded in Equatorial Guinea?
The lowest recorded value was 144 days in 2005.
How does Equatorial Guinea rank for dealing with construction permits: time?
Equatorial Guinea ranks 85th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Equatorial Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Equatorial Guinea data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.