Dealing with construction permits: Time (days) (Time days) in Equatorial Guinea

Equatorial Guinea: Dealing with construction permits: Time was 144 days in 2019. ▬ Flat

Latest (2019)
144 days
Change on year
unchanged
World rank
88th
of 188 countries
All-time high
144 days
in 2005
All-time low
144 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Equatorial Guinea, 2005–2019

0501001502005201220192005: 144 days2006: 144 days2007: 144 days2008: 144 days2009: 144 days2010: 144 days2011: 144 days2012: 144 days2013: 144 days2014: 144 days2015: 144 days2016: 144 days2017: 144 days2018: 144 days2019: 144 days

Source: World Bank. Measured in days.

Analysis

Equatorial Guinea recorded 144 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Equatorial Guinea peaked at 144 days in 2005 and was at its lowest, 144 days, in 2005.

Equatorial Guinea ranks 88th of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Equatorial Guinea, year by year

Annual values for Dealing with construction permits: Time (days) in Equatorial Guinea, 2005 to 2019.
Year days Change
2005 144 days —
2006 144 days +0.0%
2007 144 days +0.0%
2008 144 days +0.0%
2009 144 days +0.0%
2010 144 days +0.0%
2011 144 days +0.0%
2012 144 days +0.0%
2013 144 days +0.0%
2014 144 days +0.0%
2015 144 days +0.0%
2016 144 days +0.0%
2017 144 days +0.0%
2018 144 days +0.0%
2019 144 days +0.0%

Equatorial Guinea compared with similar countries

  • Equatorial Guinea's 144 days is above the median for upper middle income countries, which is 131 days, 1.1× the median. (55 countries reporting)
  • Equatorial Guinea's 144 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.0× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 144 days 144 days 144 days 5
2010s 144 days 144 days 144 days 10

Countries ranked near Equatorial Guinea

  1. 87 San Marino 145.5 days compare
  2. 88 Antigua and Barbuda 144 days compare
  3. 90 Guinea-Bissau 143 days compare
  4. 91 Belize 142 days compare

See the full ranking of 188 places →

More private sector data for Equatorial Guinea

All data for Equatorial Guinea →

Frequently asked questions

What is dealing with construction permits: time in Equatorial Guinea?
Dealing with construction permits: time in Equatorial Guinea was 144 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Equatorial Guinea?
The highest recorded value was 144 days in 2005.
What is the lowest dealing with construction permits: time recorded in Equatorial Guinea?
The lowest recorded value was 144 days in 2005.
How does Equatorial Guinea rank for dealing with construction permits: time?
Equatorial Guinea ranks 88th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Equatorial Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Equatorial Guinea data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Equatorial Guinea. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/equatorial-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/equatorial-guinea/">Dealing with construction permits: Time in Equatorial Guinea</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.