Antigua and Barbuda vs San Marino: Dealing with construction permits: Time

Antigua and Barbuda
144 days
in 2019
San Marino
145.5 days
in 2019
Antigua and Barbuda rank
87th
San Marino rank
86th

Dealing with construction permits: Time over time

  • Antigua and Barbuda
  • San Marino
050100150200200520122019

How they compare

San Marino currently reports 145.5 days against 144 days in Antigua and Barbuda, a difference of 1.5 days.

Across all 8 years both countries report, San Marino has been ahead every year.

Antigua and Barbuda ranks 87th and San Marino ranks 86th of 187 countries.

San Marino has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Antigua and Barbuda or San Marino?
San Marino, at 145.5 days against 144 days in Antigua and Barbuda as of 2019.
What is the difference in dealing with construction permits: time between Antigua and Barbuda and San Marino?
1.5 days, with San Marino ahead.
How many years of comparable data are there for Antigua and Barbuda and San Marino?
8 years are reported by both, from 2012 to 2019.
How do Antigua and Barbuda and San Marino rank globally for dealing with construction permits: time?
Antigua and Barbuda ranks 87th and San Marino ranks 86th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Antigua and Barbuda vs San Marino: Dealing with construction permits: Time. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/antigua-and-barbuda/san-marino/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/antigua-and-barbuda/san-marino/">Antigua and Barbuda vs San Marino: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.