Dealing with construction permits: Time (days) (Time days) in San Marino
San Marino: Dealing with construction permits: Time was 145.5 days in 2019. ▼ Falling
Dealing with construction permits: Time in San Marino, 2012–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in San Marino stood at 145.5 days.
The figure is up 0.7% over ten years.
San Marino ranks 87th of 188 countries on this measure, in the middle of the range.
Dealing with construction permits: Time in San Marino, year by year
| Year | days | Change |
|---|---|---|
| 2012 | 144.5 days | — |
| 2013 | 185.5 days | +28.4% |
| 2014 | 185.5 days | +0.0% |
| 2015 | 185.5 days | +0.0% |
| 2016 | 145.5 days | -21.6% |
| 2017 | 145.5 days | +0.0% |
| 2018 | 145.5 days | +0.0% |
| 2019 | 145.5 days | +0.0% |
San Marino compared with similar countries
- San Marino's 145.5 days is above the median for high income countries, which is 144.75 days, 1.0× the median. (62 countries reporting)
- San Marino's 145.5 days is below the median for Europe & Central Asia, which is 156 days, 93% of the median. (49 countries reporting)
Countries ranked near San Marino
- 84 Croatia 146 days compare
- 84 Djibouti 146 days compare
- 84 Grenada 146 days compare
- 88 Antigua and Barbuda 144 days compare
- 88 Equatorial Guinea 144 days compare
- 90 Guinea-Bissau 143 days compare
More private sector data for San Marino
- Commercial service exports (current US$), per capita 36,782 current US$ per person (2023)
- Commercial service exports 1.25 billion current US$ (2023)
- Commercial service exports (current US$), per unit of GDP 0.6144 current US$ per US$ of GDP (2023)
- Transport services 34.3% (2023)
- Commercial service imports (current US$), per capita 26,404 current US$ per person (2023)
- Computer, communications and other services 37.5% (2023)
- Commercial service imports 894.03 million current US$ (2023)
- Computer, communications and other services 59.5% (2023)
- Commercial service imports (current US$), per unit of GDP 0.441 current US$ per US$ of GDP (2023)
- Travel services 25.0% (2023)
Frequently asked questions
- What is dealing with construction permits: time in San Marino?
- Dealing with construction permits: time in San Marino was 145.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in San Marino?
- The highest recorded value was 185.5 days in 2013.
- What is the lowest dealing with construction permits: time recorded in San Marino?
- The lowest recorded value was 144.5 days in 2012.
- How does San Marino rank for dealing with construction permits: time?
- San Marino ranks 87th out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in San Marino?
- Over the last ten years it is up 0.7%. The long-run trend across the full record is falling.
- Where does this San Marino data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.