Dealing with construction permits: Time in San Marino
San Marino: Dealing with construction permits: Time was 145.5 days in 2019. ▼ Falling
Dealing with construction permits: Time in San Marino, 2012–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in San Marino stood at 145.5 days.
The figure is up 0.7% over ten years.
San Marino ranks 84th of 185 countries on this measure, in the middle of the range.
Countries ranked near San Marino
- 81 Spain 147 days compare
- 82 Croatia 146 days compare
- 82 Grenada 146 days compare
- 85 Antigua and Barbuda 144 days compare
- 85 Equatorial Guinea 144 days compare
- 87 Guinea-Bissau 143 days compare
More private sector data for San Marino
- Commercial service exports 1.25 billion current US$ (2023)
- Transport services 34.3% (2023)
- Computer, communications and other services 37.5% (2023)
- Commercial service imports 894.03 million current US$ (2023)
- Computer, communications and other services 59.5% (2023)
- Travel services 25.0% (2023)
- Travel services 33.3% (2023)
- Transport services 4.8% (2023)
- Insurance and financial services 3.2% (2023)
- Merchandise imports from economies in the Arab World 0.1% (2023)
Frequently asked questions
- What is dealing with construction permits: time in San Marino?
- Dealing with construction permits: time in San Marino was 145.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in San Marino?
- The highest recorded value was 185.5 days in 2013.
- What is the lowest dealing with construction permits: time recorded in San Marino?
- The lowest recorded value was 144.5 days in 2012.
- How does San Marino rank for dealing with construction permits: time?
- San Marino ranks 84th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in San Marino?
- Over the last ten years it is up 0.7%. The long-run trend across the full record is falling.
- Where does this San Marino data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.