Dealing with construction permits: Time (days) (Time days) in San Marino

San Marino: Dealing with construction permits: Time was 145.5 days in 2019. ▼ Falling

Latest (2019)
145.5 days
Change on year
unchanged
World rank
87th
of 188 countries
All-time high
185.5 days
in 2013
All-time low
144.5 days
in 2012
Years of data
8
2012–2019

Dealing with construction permits: Time in San Marino, 2012–2019

0501001502002012201520192012: 144.5 days2013: 185.5 days2014: 185.5 days2015: 185.5 days2016: 145.5 days2017: 145.5 days2018: 145.5 days2019: 145.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in San Marino stood at 145.5 days.

The figure is up 0.7% over ten years.

San Marino ranks 87th of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in San Marino, year by year

Annual values for Dealing with construction permits: Time (days) in San Marino, 2012 to 2019.
Year days Change
2012 144.5 days —
2013 185.5 days +28.4%
2014 185.5 days +0.0%
2015 185.5 days +0.0%
2016 145.5 days -21.6%
2017 145.5 days +0.0%
2018 145.5 days +0.0%
2019 145.5 days +0.0%

San Marino compared with similar countries

  • San Marino's 145.5 days is above the median for high income countries, which is 144.75 days, 1.0× the median. (62 countries reporting)
  • San Marino's 145.5 days is below the median for Europe & Central Asia, which is 156 days, 93% of the median. (49 countries reporting)

Countries ranked near San Marino

  1. 84 Croatia 146 days compare
  2. 84 Djibouti 146 days compare
  3. 84 Grenada 146 days compare
  4. 88 Antigua and Barbuda 144 days compare
  5. 88 Equatorial Guinea 144 days compare
  6. 90 Guinea-Bissau 143 days compare

See the full ranking of 188 places →

More private sector data for San Marino

All data for San Marino →

Frequently asked questions

What is dealing with construction permits: time in San Marino?
Dealing with construction permits: time in San Marino was 145.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in San Marino?
The highest recorded value was 185.5 days in 2013.
What is the lowest dealing with construction permits: time recorded in San Marino?
The lowest recorded value was 144.5 days in 2012.
How does San Marino rank for dealing with construction permits: time?
San Marino ranks 87th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in San Marino?
Over the last ten years it is up 0.7%. The long-run trend across the full record is falling.
Where does this San Marino data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in San Marino. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/san-marino/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/san-marino/">Dealing with construction permits: Time in San Marino</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.