Argentina vs Brazil: Dealing with construction permits: Time (days) (Time days)

Argentina
318 days
in 2019
Brazil
338.37 days
in 2019
Argentina rank
7th
Brazil rank
5th

Dealing with construction permits: Time (days) (Time days) over time

  • Argentina
  • Brazil
0100200300400200520122019

How they compare

Brazil currently reports 338.37 days against 318 days in Argentina, a difference of 20.37 days.

That makes Brazil's figure about 1.1 times Argentina's.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Argentina ahead.

Argentina ranks 7th and Brazil ranks 5th of 188 countries.

Brazil has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Argentina Brazil Difference Ahead
2000s 365 days 378.2 days 13.2 days Brazil
2010s 360.55 days 361.36 days 0.809 days Brazil

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Argentina or Brazil?
Brazil, at 338.37 days against 318 days in Argentina as of 2019.
What is the difference in dealing with construction permits: time between Argentina and Brazil?
20.37 days, with Brazil ahead.
How many years of comparable data are there for Argentina and Brazil?
15 years are reported by both, from 2005 to 2019.
How do Argentina and Brazil rank globally for dealing with construction permits: time?
Argentina ranks 7th and Brazil ranks 5th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Argentina vs Brazil: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/argentina/brazil/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/argentina/brazil/">Argentina vs Brazil: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.