Argentina vs Brazil: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Argentina
- Brazil
How they compare
Brazil currently reports 338.37 days against 318 days in Argentina, a difference of 20.37 days.
That makes Brazil's figure about 1.1 times Argentina's.
The two have swapped places 3 times across 15 shared years of data; in 2005 it was Argentina ahead.
Argentina ranks 7th and Brazil ranks 5th of 185 countries.
Brazil has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Argentina | Brazil | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 365 days | 378.2 days | 13.2 days | Brazil |
| 2010s | 360.55 days | 361.36 days | 0.809 days | Brazil |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Argentina or Brazil?
- Brazil, at 338.37 days against 318 days in Argentina as of 2019.
- What is the difference in dealing with construction permits: time between Argentina and Brazil?
- 20.37 days, with Brazil ahead.
- How many years of comparable data are there for Argentina and Brazil?
- 15 years are reported by both, from 2005 to 2019.
- How do Argentina and Brazil rank globally for dealing with construction permits: time?
- Argentina ranks 7th and Brazil ranks 5th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.