Dealing with construction permits: Time (days) (Time days) in Brazil

Brazil: Dealing with construction permits: Time was 338.37 days in 2019. ▼ Falling

Latest (2019)
338.37 days
Change on year
unchanged
World rank
5th
of 188 countries
All-time high
416 days
in 2007
All-time low
322 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Brazil, 2005–2019

01002003004002005201220192005: 322 days2006: 322 days2007: 416 days2008: 416 days2009: 415 days2010: 415 days2011: 415 days2012: 415 days2013: 338.4 days2014: 338.4 days2015: 338.4 days2016: 338.4 days2017: 338.4 days2018: 338.4 days2019: 338.4 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Brazil is 338.37 days, measured in 2019.

Compared with earlier readings it is down 18.5% over ten years.

Over the whole period, dealing with construction permits: time in Brazil peaked at 416 days in 2007 and was at its lowest, 322 days, in 2005.

Brazil ranks 5th of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Brazil, year by year

Annual values for Dealing with construction permits: Time (days) in Brazil, 2005 to 2019.
Year days Change
2005 322 days —
2006 322 days +0.0%
2007 416 days +29.2%
2008 416 days +0.0%
2009 415 days -0.2%
2010 415 days +0.0%
2011 415 days +0.0%
2012 415 days +0.0%
2013 338.37 days -18.5%
2014 338.37 days +0.0%
2015 338.37 days +0.0%
2016 338.37 days +0.0%
2017 338.37 days +0.0%
2018 338.37 days +0.0%
2019 338.37 days +0.0%

Brazil compared with similar countries

  • Brazil's 338.37 days is above the median for upper middle income countries, which is 131 days, 2.6× the median. (55 countries reporting)
  • Brazil's 338.37 days is above the median for Latin America & Caribbean, which is 165 days, 2.1× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 378.2 days 322 days 416 days 5
2010s 361.36 days 338.37 days 415 days 10

Countries ranked near Brazil

  1. 2 Cyprus 507 days compare
  2. 3 Venezuela 434 days compare
  3. 4 Barbados 377 days compare
  4. 6 Albania 324 days compare
  5. 7 Argentina 318 days compare
  6. 8 El Salvador 310 days compare

See the full ranking of 188 places →

More private sector data for Brazil

All data for Brazil →

Frequently asked questions

What is dealing with construction permits: time in Brazil?
Dealing with construction permits: time in Brazil was 338.37 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Brazil?
The highest recorded value was 416 days in 2007.
What is the lowest dealing with construction permits: time recorded in Brazil?
The lowest recorded value was 322 days in 2005.
How does Brazil rank for dealing with construction permits: time?
Brazil ranks 5th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Brazil?
Over the last ten years it is down 18.5%. The long-run trend across the full record is falling.
Where does this Brazil data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Brazil. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/brazil/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/brazil/">Dealing with construction permits: Time in Brazil</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.