Argentina vs Moldova: Dealing with construction permits: Time

Argentina
318 days
in 2019
Moldova
278 days
in 2019
Argentina rank
7th
Moldova rank
10th

Dealing with construction permits: Time over time

  • Argentina
  • Moldova
0100200300400200520122019

How they compare

Argentina currently reports 318 days against 278 days in Moldova, a difference of 40 days.

That makes Argentina's figure about 1.1 times Moldova's.

Across all 15 years both countries report, Argentina has been ahead every year.

Argentina ranks 7th and Moldova ranks 10th of 185 countries.

Argentina has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Argentina Moldova Difference Ahead
2000s 365 days 341 days 24 days Argentina
2010s 360.55 days 309.9 days 50.65 days Argentina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Argentina or Moldova?
Argentina, at 318 days against 278 days in Moldova as of 2019.
What is the difference in dealing with construction permits: time between Argentina and Moldova?
40 days, with Argentina ahead.
How many years of comparable data are there for Argentina and Moldova?
15 years are reported by both, from 2005 to 2019.
How do Argentina and Moldova rank globally for dealing with construction permits: time?
Argentina ranks 7th and Moldova ranks 10th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.