Dealing with construction permits: Time (days) (Time days) in Moldova

Moldova: Dealing with construction permits: Time was 278 days in 2019. ▼ Falling

Latest (2019)
278 days
Change on year
down 10.3%
World rank
10th
of 188 countries
All-time high
341 days
in 2005
All-time low
278 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Moldova, 2005–2019

01002003002005201220192005: 341 days2006: 341 days2007: 341 days2008: 341 days2009: 341 days2010: 341 days2011: 310 days2012: 310 days2013: 310 days2014: 310 days2015: 310 days2016: 310 days2017: 310 days2018: 310 days2019: 278 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Moldova is 278 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 10.3% on the previous year and down 18.5% over ten years.

Over the whole period, dealing with construction permits: time in Moldova peaked at 341 days in 2005 and was at its lowest, 278 days, in 2019.

That places Moldova 10th out of 188 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Moldova, year by year

Annual values for Dealing with construction permits: Time (days) in Moldova, 2005 to 2019.
Year days Change
2005 341 days —
2006 341 days +0.0%
2007 341 days +0.0%
2008 341 days +0.0%
2009 341 days +0.0%
2010 341 days +0.0%
2011 310 days -9.1%
2012 310 days +0.0%
2013 310 days +0.0%
2014 310 days +0.0%
2015 310 days +0.0%
2016 310 days +0.0%
2017 310 days +0.0%
2018 310 days +0.0%
2019 278 days -10.3%

Moldova compared with similar countries

  • Moldova's 278 days is above the median for upper middle income countries, which is 131 days, 2.1× the median. (55 countries reporting)
  • Moldova's 278 days is above the median for Europe & Central Asia, which is 156 days, 1.8× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 341 days 341 days 341 days 5
2010s 309.9 days 278 days 341 days 10

Countries ranked near Moldova

  1. 7 Argentina 318 days compare
  2. 8 El Salvador 310 days compare
  3. 9 Slovakia 300 days compare
  4. 11 Lebanon 276 days compare
  5. 12 Gabon 275 days compare
  6. 13 Bangladesh 273.52 days compare

See the full ranking of 188 places →

More private sector data for Moldova

All data for Moldova →

Frequently asked questions

What is dealing with construction permits: time in Moldova?
Dealing with construction permits: time in Moldova was 278 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Moldova?
The highest recorded value was 341 days in 2005.
What is the lowest dealing with construction permits: time recorded in Moldova?
The lowest recorded value was 278 days in 2019.
How does Moldova rank for dealing with construction permits: time?
Moldova ranks 10th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Moldova?
Over the last ten years it is down 18.5%. The long-run trend across the full record is falling.
Where does this Moldova data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Moldova. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/moldova/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/moldova/">Dealing with construction permits: Time in Moldova</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.