Argentina vs Slovakia: Dealing with construction permits: Time

Argentina
318 days
in 2019
Slovakia
300 days
in 2019
Argentina rank
7th
Slovakia rank
9th

Dealing with construction permits: Time over time

  • Argentina
  • Slovakia
0100200300400200520122019

How they compare

Argentina currently reports 318 days against 300 days in Slovakia, a difference of 18 days.

That makes Argentina's figure about 1.1 times Slovakia's.

Across all 15 years both countries report, Argentina has been ahead every year.

Argentina ranks 7th and Slovakia ranks 9th of 185 countries.

Argentina has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Argentina Slovakia Difference Ahead
2000s 365 days 300 days 65 days Argentina
2010s 360.55 days 300 days 60.55 days Argentina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Argentina or Slovakia?
Argentina, at 318 days against 300 days in Slovakia as of 2019.
What is the difference in dealing with construction permits: time between Argentina and Slovakia?
18 days, with Argentina ahead.
How many years of comparable data are there for Argentina and Slovakia?
15 years are reported by both, from 2005 to 2019.
How do Argentina and Slovakia rank globally for dealing with construction permits: time?
Argentina ranks 7th and Slovakia ranks 9th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.