Armenia vs Bulgaria: Dealing with construction permits: Time

Armenia
99 days
in 2019
Bulgaria
97 days
in 2019
Armenia rank
143rd
Bulgaria rank
146th

Dealing with construction permits: Time over time

  • Armenia
  • Bulgaria
050100150200200520122019

How they compare

Armenia currently reports 99 days against 97 days in Bulgaria, a difference of 2 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Armenia ahead.

Armenia ranks 143rd and Bulgaria ranks 146th of 185 countries.

Armenia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Armenia Bulgaria Difference Ahead
2000s 182.8 days 114.2 days 68.6 days Armenia
2010s 106.1 days 99.2 days 6.9 days Armenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Armenia or Bulgaria?
Armenia, at 99 days against 97 days in Bulgaria as of 2019.
What is the difference in dealing with construction permits: time between Armenia and Bulgaria?
2 days, with Armenia ahead.
How many years of comparable data are there for Armenia and Bulgaria?
15 years are reported by both, from 2005 to 2019.
How do Armenia and Bulgaria rank globally for dealing with construction permits: time?
Armenia ranks 143rd and Bulgaria ranks 146th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.