Dealing with construction permits: Time in Bulgaria

Bulgaria: Dealing with construction permits: Time was 97 days in 2019. ▼ Falling

Latest (2019)
97 days
Change on year
unchanged
World rank
146th
of 185 countries
All-time high
121 days
in 2007
All-time low
97 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Bulgaria, 2005–2019

02550751001252005201220192005: 117 days2006: 117 days2007: 121 days2008: 108 days2009: 108 days2010: 108 days2011: 108 days2012: 97 days2013: 97 days2014: 97 days2015: 97 days2016: 97 days2017: 97 days2018: 97 days2019: 97 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Bulgaria is 97 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 10.2% over ten years.

Over the whole period, dealing with construction permits: time in Bulgaria peaked at 121 days in 2007 and was at its lowest, 97 days, in 2012.

That places Bulgaria 146th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 114.2 days 108 days 121 days 5
2010s 99.2 days 97 days 108 days 10

Countries ranked near Bulgaria

  1. 143 Armenia 99 days compare
  2. 143 Solomon Islands 99 days compare
  3. 145 Niger 98 days compare
  4. 146 Haiti 97 days compare
  5. 146 Rwanda 97 days compare
  6. 149 Mauritius 95.5 days compare

See the full ranking of 187 places →

More private sector data for Bulgaria

All data for Bulgaria →

Frequently asked questions

What is dealing with construction permits: time in Bulgaria?
Dealing with construction permits: time in Bulgaria was 97 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Bulgaria?
The highest recorded value was 121 days in 2007.
What is the lowest dealing with construction permits: time recorded in Bulgaria?
The lowest recorded value was 97 days in 2012.
How does Bulgaria rank for dealing with construction permits: time?
Bulgaria ranks 146th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Bulgaria?
Over the last ten years it is down 10.2%. The long-run trend across the full record is falling.
Where does this Bulgaria data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.