Dealing with construction permits: Time (days) (Time days) in Armenia

Armenia: Dealing with construction permits: Time was 99 days in 2019. ▼ Falling

Latest (2019)
99 days
Change on year
unchanged
World rank
146th
of 188 countries
All-time high
214 days
in 2005
All-time low
99 days
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Time in Armenia, 2005–2019

0501001502002005201220192005: 214 days2006: 179 days2007: 179 days2008: 177 days2009: 165 days2010: 165 days2011: 100 days2012: 100 days2013: 100 days2014: 100 days2015: 100 days2016: 99 days2017: 99 days2018: 99 days2019: 99 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Armenia is 99 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 40.0% over ten years.

Over the whole period, dealing with construction permits: time in Armenia peaked at 214 days in 2005 and was at its lowest, 99 days, in 2016.

That places Armenia 146th out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Armenia, year by year

Annual values for Dealing with construction permits: Time (days) in Armenia, 2005 to 2019.
Year days Change
2005 214 days —
2006 179 days -16.4%
2007 179 days +0.0%
2008 177 days -1.1%
2009 165 days -6.8%
2010 165 days +0.0%
2011 100 days -39.4%
2012 100 days +0.0%
2013 100 days +0.0%
2014 100 days +0.0%
2015 100 days +0.0%
2016 99 days -1.0%
2017 99 days +0.0%
2018 99 days +0.0%
2019 99 days +0.0%

Armenia compared with similar countries

  • Armenia's 99 days is below the median for upper middle income countries, which is 131 days, 76% of the median. (55 countries reporting)
  • Armenia's 99 days is below the median for Europe & Central Asia, which is 156 days, 63% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 182.8 days 165 days 214 days 5
2010s 106.1 days 99 days 165 days 10

Countries ranked near Armenia

  1. 143 Saudi Arabia 100 days compare
  2. 143 Turkey 100 days compare
  3. 145 Serbia 99.5 days compare
  4. 146 Solomon Islands 99 days compare
  5. 148 Niger 98 days compare
  6. 149 Bulgaria 97 days compare
  7. 149 Haiti 97 days compare
  8. 149 Rwanda 97 days compare

See the full ranking of 188 places →

More private sector data for Armenia

All data for Armenia →

Frequently asked questions

What is dealing with construction permits: time in Armenia?
Dealing with construction permits: time in Armenia was 99 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Armenia?
The highest recorded value was 214 days in 2005.
What is the lowest dealing with construction permits: time recorded in Armenia?
The lowest recorded value was 99 days in 2016.
How does Armenia rank for dealing with construction permits: time?
Armenia ranks 146th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Armenia?
Over the last ten years it is down 40.0%. The long-run trend across the full record is falling.
Where does this Armenia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Armenia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/armenia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/armenia/">Dealing with construction permits: Time in Armenia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.