Dealing with construction permits: Time in Armenia

Armenia: Dealing with construction permits: Time was 99 days in 2019. ▼ Falling

Latest (2019)
99 days
Change on year
unchanged
World rank
143rd
of 185 countries
All-time high
214 days
in 2005
All-time low
99 days
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Time in Armenia, 2005–2019

0501001502002005201220192005: 214 days2006: 179 days2007: 179 days2008: 177 days2009: 165 days2010: 165 days2011: 100 days2012: 100 days2013: 100 days2014: 100 days2015: 100 days2016: 99 days2017: 99 days2018: 99 days2019: 99 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Armenia is 99 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 40.0% over ten years.

Over the whole period, dealing with construction permits: time in Armenia peaked at 214 days in 2005 and was at its lowest, 99 days, in 2016.

That places Armenia 143rd out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 182.8 days 165 days 214 days 5
2010s 106.1 days 99 days 165 days 10

Countries ranked near Armenia

  1. 140 Saudi Arabia 100 days compare
  2. 140 Turkey 100 days compare
  3. 142 Serbia 99.5 days compare
  4. 143 Solomon Islands 99 days compare
  5. 145 Niger 98 days compare
  6. 146 Bulgaria 97 days compare
  7. 146 Haiti 97 days compare
  8. 146 Rwanda 97 days compare

See the full ranking of 187 places →

More private sector data for Armenia

All data for Armenia →

Frequently asked questions

What is dealing with construction permits: time in Armenia?
Dealing with construction permits: time in Armenia was 99 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Armenia?
The highest recorded value was 214 days in 2005.
What is the lowest dealing with construction permits: time recorded in Armenia?
The lowest recorded value was 99 days in 2016.
How does Armenia rank for dealing with construction permits: time?
Armenia ranks 143rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Armenia?
Over the last ten years it is down 40.0%. The long-run trend across the full record is falling.
Where does this Armenia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.