Armenia vs Saudi Arabia: Dealing with construction permits: Time

Armenia
99 days
in 2019
Saudi Arabia
100 days
in 2019
Armenia rank
143rd
Saudi Arabia rank
140th

Dealing with construction permits: Time over time

  • Armenia
  • Saudi Arabia
050100150200200520122019

How they compare

Saudi Arabia currently reports 100 days against 99 days in Armenia, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Armenia ahead.

Armenia ranks 143rd and Saudi Arabia ranks 140th of 185 countries.

Armenia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Armenia Saudi Arabia Difference Ahead
2000s 182.8 days 147.8 days 35 days Armenia
2010s 106.1 days 105.9 days 0.2 days Armenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Armenia or Saudi Arabia?
Saudi Arabia, at 100 days against 99 days in Armenia as of 2019.
What is the difference in dealing with construction permits: time between Armenia and Saudi Arabia?
1 days, with Saudi Arabia ahead.
How many years of comparable data are there for Armenia and Saudi Arabia?
15 years are reported by both, from 2005 to 2019.
How do Armenia and Saudi Arabia rank globally for dealing with construction permits: time?
Armenia ranks 143rd and Saudi Arabia ranks 140th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.