Dealing with construction permits: Time in Saudi Arabia
Saudi Arabia: Dealing with construction permits: Time was 100 days in 2019. ▼ Falling
Dealing with construction permits: Time in Saudi Arabia, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Saudi Arabia is 100 days, measured in 2019. That is the lowest value across all 15 years on record.
The figure is down 5.2% on the previous year and down 18.7% over ten years.
Over the whole period, dealing with construction permits: time in Saudi Arabia peaked at 154 days in 2005 and was at its lowest, 100 days, in 2019.
That places Saudi Arabia 140th out of 185 countries with data for 2019, putting it in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 147.8 days | 123 days | 154 days | 5 |
| 2010s | 105.9 days | 100 days | 112 days | 10 |
Countries ranked near Saudi Arabia
- 137 Botswana 102 days compare
- 137 Montenegro 102 days compare
- 139 Cabo Verde 101 days compare
- 140 Turkiye 100 days compare
- 142 Serbia 99.5 days compare
- 143 Armenia 99 days compare
- 143 Solomon Islands 99 days compare
More private sector data for Saudi Arabia
- Merchandise trade 44.2% (2025)
- Food imports 13.0% (2024)
- Manufactures imports 70.5% (2024)
- Merchandise imports 254.06 billion current US$ (2025)
- Food exports 1.9% (2024)
- Manufactures exports 15.9% (2024)
- Merchandise exports 310.67 billion current US$ (2025)
- Commercial service exports 66.92 billion current US$ (2025)
- Transport services 29.9% (2025)
- Computer, communications and other services 39.2% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Saudi Arabia?
- Dealing with construction permits: time in Saudi Arabia was 100 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Saudi Arabia?
- The highest recorded value was 154 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Saudi Arabia?
- The lowest recorded value was 100 days in 2019.
- How does Saudi Arabia rank for dealing with construction permits: time?
- Saudi Arabia ranks 140th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Saudi Arabia?
- Over the last ten years it is down 18.7%. The long-run trend across the full record is falling.
- Where does this Saudi Arabia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.